My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017.06.06 WS Agenda C
NewBrighton
>
Council
>
Packets
>
2017
>
2017.06.06 WS Agenda C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 5:29:15 PM
Creation date
1/3/2018 4:21:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sample Equipment <br /> <br />CRS will be on hand at the June 6 Council Work Session and will have samples <br />of their equipment on hand. They plan to include the following samples: <br /> <br /> 2" Steel Pipe <br /> Clamps for Pipe <br /> Plastic Tube Samples <br /> Pole Foam Samples <br /> Web Samples <br /> Heavy Duty Zip Ties <br /> Colored Zip Ties <br /> Duramesh Netting <br /> Duramesh Netting Clips/ Screws <br /> Samples of Vinyl Leathers <br /> Double Molded Plastic Deck Sample <br /> Alternative for 1" Deck Sample <br /> <br /> <br />Because the other vendors are no longer in consideration at this point, their <br />materials are not available. For comparison purposes, components from the <br />existing Eagles Nest Indoor Playground will be available. <br /> <br />Toddler Area <br /> <br />The proposed toddler area is 1,258 square feet. The current play structure is <br />1,100 square feet. This is a 14% increase from the current layout. <br /> <br />The toddler area will be separated from the remainder of the playground with <br />Duramesh paneling, and access would be controlled through an access gate. <br /> <br />Updated Timeline <br /> <br />June 6 – Council Work Session <br />June 13 – Council Meeting approve project <br />June 20 – Executed agreement, initial deposit due to CRS <br />September 5-8 – Demo of current Eagles Nest <br />September 11-15 – Improvement to sprinkler system, clean and prep of area for <br />installation <br />September 18-October 16 – Installation of new Eagles Nest Indoor Playground <br />October 17 – Tentative opening of Eagles Nest Playground <br />
The URL can be used to link to this page
Your browser does not support the video tag.