Laserfiche WebLink
<br /> <br /> Combustion Heat & Power Mechanical & Electrical Services A Division of NAC <br /> 1001 Labore Industrial Court, Suite B Vadnais Heights, Minnesota 55110 tel: 651-490-9868 fax: 651-490-1636 <br /> <br />www.nac-hvac.com, 24 Hour Service <br />An Affirmative Action, Equal Employment Opportunity Employer <br />Direct (651) 255-3578 Fax (651) 490-1636 Cell (651) 788-1038 Email ejohnson@nac-hvac.com <br /> <br />HVAC Mechanical - Building Automation - Electrical - Plumbing - Sheet Metal - Preventative Maintenance - Service Repairs - Combustion Services - Communications <br /> <br />June 22, 2017 <br /> <br />New Brighton Community Center <br />400 10th Street NW <br />New Brighton, MN 55112 <br />Email: bill.bach@newbrightonmn.gov <br />Tel: 651-638-2122 <br /> <br />Re: Play Area Exhaust, Electrical & Fire Alarm <br /> <br />Attn: Bill Bach <br /> <br />NAC is pleased to offer the following proposal: <br /> <br />Exhaust Service Includes: <br />• Coordination with client. <br />• Provide and install one (1) smoke & fire rated Greenheck 8,800 Cfm, Model RBUMO roof <br />mounted smoke evacuation exhaust fan with gravity butterfly damper and an insulated roof <br />curb. <br />• Provide and install approx... 3ft. of exhaust ductwork. (18” exposed into the play area) <br />• Provide crane service. <br />• Provide roofing. <br />• Permits. <br /> <br />Electrical and Fire Alarm Service Includes: <br />• Coordinate with client. <br />• Power to new exhaust fan including conduit, wire, disconnect and breaker. <br />• (14) FSP 851 Addressable smoke detector heads. <br />• (1) FRM-1 Addressable relay module. <br />• Conduit and wiring for 14 smoke detectors located at play area ceiling. <br />• Final fire alarm panel connections, programming and check out by Nardini. <br />• All fire alarm components furnished by Nardini included in this proposal. <br />• Lift rental included. <br />• Permits and inspections included. <br /> <br />Proposed Amount: $20,552.00 <br /> <br />Notes: <br />1. 50% down payment required. <br />2. Proposal subject to escalation 30 days after above date. <br />3. Proposal based upon normal working hours. <br />4. Any required code upgrades or modifications required will be performed at time and material <br />basis upon proper approval.