Laserfiche WebLink
Street Reconstruction Plan <br />2006-2035 Street <br />Reconstruction Projects <br />(64.48 miles) <br />2016-2045 Street <br />Reconstruction Projects <br />(64.03 miles) <br />The GOOD <br />2006-2015 8.20 miles (12.7%) <br />The BAD <br />2016-2025 26.06 miles (40.4%) <br />The UGLY <br />2026-2035 30.22 miles (46.9%) <br />The GOOD <br />2016-2025 21.21 miles (33.1%) <br />The GOOD <br />2026-2035 21.33 miles (33.3%) <br />The GOOD <br />2036-2045 21.49 miles (33.5%) <br />Comprehensive Street Plan <br />30 Year Service Life <br />64.48/30=2.15 miles/yr