My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017.11.28 WS
NewBrighton
>
Council
>
Packets
>
2017
>
2017.11.28 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 5:29:16 PM
Creation date
1/5/2018 5:22:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PROJECTS <br />Department: Water <br />Item: Pavement Management – Parking Lots <br />Year(s)/Cost: 2018 – Wells 11 & 14 $5,800 [Well #11; Army to pay cost of Well #14] <br />Delayed this work with RCWD using this area for access to Hansen Park <br />$12,000 <br />$11,600 <br /> $15,000 <br />2027 – Well 15 <br />2032 – Well 8 <br />2033 W – ell 12 <br />2034 W – ell 10 $34,700 <br />Description: This item includes cost to remove and replace the parking lots and appurtenances at <br />each well location throughout the City. <br />Justification: Pavement Management is included in the Comprehensive Street Plan that was <br />adopted by the City Council in 1980 and 2008. The goal of the Plan is the following: <br />1.Optimize pavement service life <br />2.Stabilize maintenance requirements <br />3.Minimize financial impact on the community <br />4.Provide uniformity and consistency in the treatment of pavement problems <br />5.Improve chances of obtaining project approvals <br />6.Provide a schedule for correction of utility and drainage <br />Pavements typically do not last longer than 30 years without incurring significant maintenance <br />expenses. As such, the replacement of parking lots is scheduled on a 30-year cycle. <br />Page 15
The URL can be used to link to this page
Your browser does not support the video tag.