My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017.12.12 WS
NewBrighton
>
Council
>
Packets
>
2017
>
2017.12.12 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 5:29:16 PM
Creation date
1/5/2018 5:27:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Old Highway 8/8th Avenue NW: <br />Operations (Traffic Signal) <br />I-35W North Corridor Preliminary Design Project 7 <br />Existing Construction: <br />No Mitigation <br />Construction: <br />Mitigated <br />AM 10 / 20 20 / 35 15 / 20 <br />PM 10 / 50 3 min +/ 5 min +20 / 25 <br />Overall Intersection Delay / Worst Approach Delay in seconds <br />Issue: <br />•NBL volume increases ~150 cars in p.m. peak hour <br />•SBL volume increases ~100 cars in a.m. peak hour <br />•Excessive delay for 8th Avenue approach <br />Mitigation: <br />•Change intersection from side-street stop <br />controlled to signalized <br />Installation: <br />•MnDOT paying for temporary signal, coordination, <br />and timing <br />Maintenance: <br />•Ramsey County makes coordination adjustments as <br />needed during construction8thAve NW
The URL can be used to link to this page
Your browser does not support the video tag.