My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017.12.12 WS
NewBrighton
>
Council
>
Packets
>
2017
>
2017.12.12 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 5:29:16 PM
Creation date
1/5/2018 5:27:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W County Rd E2/New Brighton Road: <br />Operations <br />I-35W North Corridor Preliminary Design Project 15 <br />Existing Construction: <br />No Mitigation <br />Construction: <br />Mitigated <br />AM 5 / 15 5 / 15 5 / 10 <br />PM 15 / 50 20 / 50 10 / 20 <br />Overall Intersection Delay / Worst Approach Delay in Seconds <br />Issue: <br />•No Issue –Signal at Cleveland Ave/E2 helps <br />break up traffic <br />Mitigation: <br />•None <br />Installation: <br />•N/A <br />Maintenance: <br />•N/A <br />W County Road E2 <br />New Brighton Rd
The URL can be used to link to this page
Your browser does not support the video tag.