My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017.12.12 WS
NewBrighton
>
Council
>
Packets
>
2017
>
2017.12.12 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 5:29:16 PM
Creation date
1/5/2018 5:27:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> City of New Brighton <br />Department of community assets and <br />development <br /> M E M O R A N D U M <br /> <br /> <br />DATE: December 6, 2017 (Work Session December 12, 2017) <br /> <br />TO: Mayor and City Council <br />Dean Lotter, City Manager <br /> <br />FROM: Craig Schlichting, Director of Community Assets and Development <br /> <br />SUBJECT: Consider Traffic Mitigation Strategies for I‐35W MnPASS project <br /> <br />Recommendation: Formal Council action is not required for implementation, but staff requests <br />that Council to provide input on mitigation strategies <br /> <br />Legislative History: None <br /> <br />Explanation: MnDOT has completed a technical analysis of the expected traffic operations on <br />the local roadway system during the I‐35W North MnPASS construction project from 2019 to <br />2022. The analysis identified expected traffic shifts during the construction and evaluated <br />impacts the diverted traffic may have on the local system. Based on the impacts, potential <br />mitigations were evaluated to improve safety and mobility during the construction period due <br />to the diverted traffic. <br />The proposed mitigations located within New Brighton are included for Council review. For <br />every mitigation, staff has indicated whether we support installation of the mitigation, and if <br />supported, the year we would prefer the mitigation to be implemented (2018 or 2019). <br />MnDOT’s proposed mitigation installation timing is based on the type of mitigation. These <br />mitigations are temporary and will be removed at the completion of the construction project. <br />Costs and Funding: MnDOT will pay for the mitigations and there will be no cost to New <br />Brighton for any of the improvements. <br /> <br /> <br />__________________________ <br />Craig G. Schlichting, P.E. <br />Director of Community Assets and Development <br /> <br />Attachments: <br /> Transportation Management Plan <br /> Mitigation Improvement List
The URL can be used to link to this page
Your browser does not support the video tag.