Laserfiche WebLink
West: Vacant Land <br /> <br />SITE PLAN ANALYSIS <br />Per Zoning Code Section 8-010, Site Plan approval is required for construction of new buildings <br />or structures other than single and double family residences. The purpose of the Site Plan <br />approval is to evaluate the plan’s conformance with applicable zoning regulations. The analysis <br />below summarizes the proposed plan’s conformance with underlying NBE, New Brighton <br />Exchange zoning district standards of Chapter 6, Article 6 of the Zoning Code. Because a PUD <br />is requested, there will be some deviations from the requirements of the NBE Zoning Code and <br />those areas will be specified in the analysis below. <br /> <br />Use/Building Type <br />The applicant is proposing a building of approximately 37,000 SF, of which the use breakdown <br />is as follows: <br /> <br />Office: 12,600 SF (34%) <br />Testing & Certification: 24,000 SF (66%) <br />Total: 36,600 SF (100%) <br /> <br />The Building Type regulations within the NBE district slated Block D for office. Nearly two <br />years ago, the Economic Development Commission considered the prospect of an “industrial <br />flex” user on Block D based upon more heavy industrial uses to the north and northeast and <br />based on the more aggressive industrial market when compared to the office market. After <br />understanding what industrial flex users might look like, the recommendation was to proceed <br />with this type of user, in addition to 100% office. This recommendation was based upon the low <br />impacts of industrial flex users, the quality of construction being higher than a typical industrial <br />user, and to realize development sooner while also meeting the intent of the NBE district <br />standards. Staff would recommend allowing a 34% office / 66% testing & certification use <br />through the PUD. <br /> <br />Building Setbacks/Build-To Line <br />Section 6-710 (1) Required Proposed <br />Front (14th ST NW) Minimum 10’, Maximum 40’ 103’* <br />Rear (south) 15’ 34’ <br />Side (west) 0’ 190’ <br />Side-Street (Northwest <br />Parkway) Minimum 10’, Maximum 40’ 100’* <br />Expansion = 10’ <br /> <br />The principal structure setbacks to the front (14th ST NW) and side street (Northwest Parkway) <br />are much greater than the minimum and maximum setbacks established in Section 6-710 (1). <br />The minimum and maximum standard was intended to force building placement up near the <br />road. Several projects within New Brighton Exchange have been approved with a greater <br />setback. This is a deviation that can be permitted through the PUD. Staff recommends approval <br />of the increased setback as several projects have been permitted a similar building placement, the <br />market has not supported the building placement originally envisioned for the New Brighton