Laserfiche WebLink
2 <br />• Properties used for commercial purposes <br />• Properties held in the name of a trust <br /> <br />11. Ownership/Occupancy: Owner Occupied. <br /> <br />12. Loan-to-Value: Maximum: 115%. <br /> <br />13. Income Limits/Requirements: No income limits. <br />• All income must be derived from within the United States. <br /> <br />14. Debt-to-Income Ratio: Max 50% <br /> <br />15. Multiple Loans per Property/Borrower: More than one loan per household/property is <br />permitted based upon the availability of funds and the borrower’s ability to qualify. The <br />cumulative outstanding balance of all Fridley loans on the property, including deferred <br />loans cannot exceed $50,000. <br /> <br />16. Eligible Improvements: Most Interior and Exterior Improvements <br /> <br />17. Ineligible Improvements: Work initiated before the loan has been approved and closed. <br />Recreational items including gazebos, pools, hot tubs, saunas, lawn sprinklers, play <br />ground equipment; Furniture and non permanent appliances; Funds used for working <br />capital, debt management, or to refinance existing loans; Personal property items, and <br />repairs to property used for business or trade purposes. Funds cannot be used to rent or <br />purchase equipment needed to complete the project. <br /> <br />18. Sweat Equity/Homeowner Labor: Work can be performed on a “sweat equity” basis. <br />Loan funds cannot be used to compensate for labor, only for materials. The homeowner <br />must demonstrate to CEE that they have the ability to complete the work within the <br />program time requirement. Materials must be purchased and installed prior to the <br />disbursement of the loan proceeds. When applicable, a signed city permit must be <br />obtained. <br /> <br />19. Pre-Property Inspection: None. <br /> <br />20. Post-Install Inspection: Prior to the release of loan proceeds, the property is subject to <br />inspection by a CEE inspector or, where a permit is required, work must be signed off by <br />a City inspector. <br /> <br />21. Contractors/ Permits: Contractors must be properly licensed to work in the City of <br />Fridley. Permits must be obtained when required by city ordinance. <br /> <br />22. Bids: 1 bid is required. Bids must detail the scope of the work to be completed, the <br />associated cost(s) and any rebates. <br /> <br />23. Work Completion: All work must be completed within 120 days of the loan closing. <br />However, when warranted, CEE may authorize extensions on a case by case basis as <br />warranted. <br />