My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017.08.02 EDC
NewBrighton
>
Commissions
>
EDC
>
EDC Packets
>
2017
>
2017.08.02 EDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 4:08:12 PM
Creation date
1/11/2018 3:52:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />22. Bids: 1 bid is required. Bids must detail the scope of the work to be completed, the <br />associated cost(s) and any rebates. <br /> <br />23. Work Completion: All work must be completed within 30 days of the loan closing. <br />However, when warranted, CEE may authorize extensions on a case by case basis as <br />warranted. <br /> <br />24. Underwriting: Applicants will be evaluated on a first-come first-served basis. Applicants <br />must not be able to qualify for any other financing to be eligible for the Emergency Last <br />Resort Program. In addition, applicants must also: <br />• Be current on all mortgage payments <br />• Be current on all real estate taxes and assessments <br />• Not have any unpaid judgments or liens <br />• Not have a pending Bankruptcy or foreclosure <br /> <br />25. Disbursement of Funds: Funds are held by CEE in a non-interest bearing account and <br />payment is made to the contractor (or owner in sweat equity situations) upon completion <br />of work. An inspection will be performed by the City and/or CEE to verify satisfactory <br />completion of the work. The following items (and any additional as determined by CEE) <br />must be received prior to final disbursement of funds: <br />1. Final invoice from contractor (or materials list from supplier) <br />2. Final inspection verification by CEE (if necessary) <br />3. Completion certificate(s) signed by borrower and contractor <br />4. Lien waiver for entire cost of work and <br />5. Evidence of required city permit, where applicable <br /> <br /> <br /> <br /> <br />MMB: 4829-9409-7961, v. 1
The URL can be used to link to this page
Your browser does not support the video tag.