Laserfiche WebLink
<br />Quiet Zone Evaluation 26 <br />New Brighton, Minnesota <br /> Flasher and gate crossing system at both rail crossings. <br /> Sidewalk/trail channelization. <br /> <br />Or, with the use of wayside horns with: <br /> Flasher and gate crossing system on 10th Street and 8th Street. <br /> Wayside horns, one for each direction on 10th Street and 8th Street. <br /> Sidewalk/trail channelization. <br /> <br />Including contingency costs for additional signing, pavement markings, engineering, <br />and other miscellaneous items, the total concept cost is between $229,700 and <br />$609,700. <br /> <br /> <br />