Laserfiche WebLink
NewB_Senior_4%_Final <br />Total Costs Per Unit <br />4% <br />Credit Basis <br />9% <br />Credit Basis <br />Historic <br />Credits Basis <br />Inter‐ <br />med.  <br />Costs Comments <br />ACQUISITION or REFINANCE EXISTING DEBT <br />Land <br />Existing Structures <br />Demolition 10,000 83 <br />10,000 83 <br />Special Assessments <br />Other <br />Other <br />Holding Costs <br />Holding Costs <br />Acquisition/Refinance Total 10,000 83 <br />CONSTRUCTION <br />New Construction <br />Residential 15,600,000 130,000 15,600,000 15,600,000 <br />Garages $ per stall: <br />Accessory Structures <br />On Site Work <br />Off Site Work <br />Other <br />Other <br />New Construction Subtotal 15,600,000 130,000 15,600,000 15,600,000 <br />Rehabilitation <br />Residential <br />Garages $ per stall <br />Accessory Structures <br />On Site Work <br />Off Site Work <br />Other <br />Other <br />Rehabilitation Subtotal <br />New and Rehabilitation Subtotal 15,600,000 130,000 15,600,000 15,600,000 <br />General Requirements 6.00% 936,000 7,800 936,000 936,000 <br />Contractor's Overhead 2.00% 312,000 2,600 312,000 312,000 <br />Contractor's Profit 6.00% 936,000 7,800 936,000 936,000 <br />Construction Contract Amount 17,784,000 148,200 17,784,000 17,784,000 <br />Construction Contingency 5.00% 889,200 7,410 889,200 889,200 <br />Total Construction Costs 18,673,200 155,610 18,673,200 18,673,200 <br />ENVIRONMENTAL ABATEMENT <br />Soil Abatement 100,000 833 100,000 100,000 <br />Lead Abatement <br />Asbestos Abatement <br />Other <br />Abatement Contingency (Agency determined) 5,000 42 5,000 5,000 <br />Abatement Total 105,000 875 105,000 105,000 <br />DEVELOPMENT COSTS <br />Acquisition/Refinance Subtotal <br />Workbook Development Costs ‐ Page 14 of 32 3/26/2018 5:31 PM