Laserfiche WebLink
Project ID Proposed ProjectsRCD2‐1Increase Culvert Capacity at 10th St NW and I‐694RCD2‐2Detention Basin North of 5th StreetRCD2‐3Increase 4th Street Storm Sewer CapacityRCD2‐4Pike Lake Channel ModificationRCD2‐5Modify Jones Lake Outlet and DredgingRCD2‐6Remmele Culvert ModificationRCD2‐7Increase Storm Sewer Capacity on RCD 3 & RCD 2 BR 1 –bothoutlets of Poplar LakeRCD2‐8Upper (South) Hansen Park –Added after Phase 1RCD3‐1Old Historic RCD 2 Branch 1 Alignment (Detention)RCD3‐2Increase RCD 3 Storm Sewer CapacityRCD3‐3Floodproofing of Individual Homes (in the vicinity of39th Street and Shamrock Drive)RCD3‐4Silver Lake Outlet ModificationRCD3‐5Route Stormwater from CR D and Foss Rd through Mirror LakeRCD5‐2Twin Lakes I‐35W Interchange Ramp and I‐35W/ClevelandAvenue Intersection ImprovementsRCD5‐3Railroad Open Channel (Roseville City Ditch #2) MaintenanceRCD5‐4St. Croix Lift Station ImprovementsRCD5‐5Wilson Lake –Added after Phase 1RCD5‐6MN Transfer Railway Pond –Added after Phase 1Proposed Projects to be StudiedProjects locatedin New Brightonin red