Laserfiche WebLink
Contractor Bid Total <br />1.Barber Construction,Inc.$119,801.00 <br />2.T.A.Schifsky &Sons,Inc.$141,096.00 <br />3.North Valley,Inc.$166,329.95 <br />4.Bituminous Roadways,Inc.$178,954.00 <br />5.Allied Blacktop Company $209,612.38