My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018.10.09 WS
NewBrighton
>
Council
>
Packets
>
2018
>
2018.10.09 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 3:22:03 PM
Creation date
2/14/2019 2:19:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 21 <br />Figure 7. 2-Year, 24-Hour Rainfall Even Hydrograph <br /> <br />4.1.3 LONG LAKE <br />One of the primary goals of the Hansen Park project is to reduce volume from the “Long Lake peak flood <br />window.” The Long Lake peak flood window is a period of time following a 100-year rainfall event in which <br />inflows have the greatest potential for effect on the peak flood elevation and duration in the lake. Figure 8 <br />provides a depiction of the Long Lake peak flood window. <br />
The URL can be used to link to this page
Your browser does not support the video tag.