My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018.03.12 Public Safety Commission Packet
NewBrighton
>
Commissions
>
Public Safety
>
Public Safety Packets
>
2018
>
2018.03.12 Public Safety Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 10:24:03 AM
Creation date
4/2/2019 9:51:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8th Avenue NW/7th Street NW: <br />Operations <br />I-35W North Corridor Preliminary Design Project 6 <br />Existing Construction: <br />No Mitigation <br />Construction: <br />Mitigated <br />AM 5 / 15 5 / 20 10 / 15 <br />PM 5 / 25 15 / 125 10 / 40 <br />Overall Intersection Delay / Worst Approach Delay in secondsIssue: <br />•EBL increases ~25 cars and NBT increases by <br />~300 cars in p.m. peak hour-no gaps for EB traffic <br />•Excessive delay for EB approach <br />Mitigation: <br />•Change traffic control from side-street stop <br />controlled to signalized <br />•Coordinate with signal at Old Hwy 8 <br />Installation: <br />•MnDOT paying for temporary signal, coordination, <br />and timing <br />Maintenance: <br />•Ramsey County makes coordination adjustments <br />as needed during construction <br />7th St NW <br />8thAve NW
The URL can be used to link to this page
Your browser does not support the video tag.