Laserfiche WebLink
W County Rd E2/Cleveland Ave N: <br />Operations <br />I-35W North Corridor Preliminary Design Project 12 <br />Existing Construction: <br />No Mitigation <br />Construction: <br />Mitigated <br />AM 5 / 15 5 / 20 10 / 15 <br />PM 35 / 85 90 / 3 min +10 / 15 <br />Overall Intersection Delay / Worst Approach Delay in Seconds <br />Issue: <br />•NB approach volume increases ~150 in p.m. peak hour <br />•Excessive delay for NB approach <br />Mitigation: <br />•Install a signal <br />Installation: <br />•MnDOT pays for temporary signal and front page signal <br />timing parameters <br />Maintenance: <br />•MnDOT and Arden Hills coordinate on signal timing <br />changes required during construction <br />W County Road E2