W County Road D/SB I-35W Ramps: <br />Operations <br />I-35W North Corridor Preliminary Design Project 18 <br />Existing Construction: <br />No Mitigation <br />Construction: <br />Mitigated <br />AM 10 10 5 <br />PM 10 15 15 <br />Overall Intersection Delay in Seconds <br />Issue: <br />•WBT and EBT volumes increase by several <br />hundred cars in p.m. peak hour <br />Mitigation: <br />•Coordinate with other signals along CR D <br />Installation: <br />•MnDOT pays for interconnect and signal <br />coordination development and implementation <br />Maintenance: <br />•MnDOT and Ramsey County coordinate on signal <br />timing changes required during construction