My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018.03.12 Public Safety Commission Packet
NewBrighton
>
Commissions
>
Public Safety
>
Public Safety Packets
>
2018
>
2018.03.12 Public Safety Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 10:24:03 AM
Creation date
4/2/2019 9:51:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Long Lake Road/EB I-694 Ramps: <br />Operations <br />I-35W North Corridor Preliminary Design Project 3 <br />Existing Construction: <br />No Mitigation <br />Construction: <br />Mitigated <br />AM 20 / 50 55 / 160 10 / 45 <br />PM 35 / 80 70 / 3 min +20 / 105 <br />Overall Intersection Delay / Worst Approach Delay in SecondsIssue: <br />•Excessive Delay for EB Approach <br />•NBT and SBT volumes increase by ~100-300 during <br />peak hours <br />Mitigation: <br />•Change traffic control from side-street stop controlled <br />to signalized –SBL FYA <br />•Coordinate with other ramp terminal and 10th St/8th Ave <br />•Change NW right-turn lane into a thru/right-turn lane <br />Installation: <br />•MnDOT paying for temporary signal, coordination, and <br />timing <br />•MnDOT paying for modification to median. <br />Maintenance: <br />•MnDOT and Ramsey County coordinate on signal timing <br />changes required during construction <br />694
The URL can be used to link to this page
Your browser does not support the video tag.