Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />interoffice <br />MEMORANDUM <br /> <br /> <br /> <br /> <br />to: Janice Gundlach, Assistant Director of Community Assets and Development/City Planner <br />from: Craig Schlichting, Director of Community Assets and Development <br />subject: Highview Middle School <br />date: May 11, 2018 <br /> <br />The Engineering Department has reviewed the site plan and preliminary grading & utility plans for <br />Highview Middle School and we offer the following comments: <br /> <br />Streets-Parking Lot <br /> <br />1. A traffic study is currently being completed, but preliminary results suggest the proposed layout and <br />access points are consistent with forthcoming recommendations from the traffic engineer. <br /> <br />2. Include additional proposed spot elevations along the curb line of the “bump out”, and at all pedestrian <br />ramps (handicap routes to insure ADA compliance). Will bus drop off area include ramps, if trying to <br />use existing ramps then spot elevations must be verified. <br /> <br />3. Do you have details of the existing storm sewer storage chamber, please provide. <br /> <br />4. It has been suggested that changes may include a revised dumpster/trash location to 23rd Avenue, <br />please clarify. <br /> <br />5. The buses are parked in a way that could limit safety vehicle access to the hydrant. A clear zone shall <br />be striped wide enough to permit fire apparatus access to hydrant. <br /> <br />Storm Sewer-Grading <br /> <br />1. All storm sewer utilities within the site are to be considered private and are the responsibility of the <br />property owners for construction and maintenance. <br /> <br />2. A permit will be required from the Rice Creek Watershed District. <br /> <br />3. Include EOF locations and elevations for the infiltration basins on the plans. Specifically 958 contour <br />must be included around east basin and asbuilt grades provided to City to insure stormwater does <br />not overflow to 7th Street. <br /> <br />4. Drainage Area E should not include west infiltration basin, as the parking area drains to 7th Street. <br /> <br /> <br />