My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018.08.21 PC
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2018
>
2018.08.21 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 11:26:00 AM
Creation date
4/2/2019 11:11:06 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
scale:date:1/8" = 1'-0"7/27/2018Dr David Ong2350 Palmer DriveNew Brighton, MN 55112EXTERIOR ELEVATIONSWITH SCREEN ANDMATERIALS856 Raymond <br />Saint Paul MN <br />5 5 1 1 4 <br />651.647.6650 <br />Structural Engineer <br />Stroh Engineering <br />1205 W Kuiaha Rd <br />Haiku HI <br />9 6 7 0 8 <br />General Contractor <br />Heritage Construction <br />Andrew Harvala <br />10908 171st Ave NW, <br />Elk River MN <br />5 5 3 3 0 <br />(763) 633-4080 <br /> <br /> REVISIONS <br />#DATE <br />1750 Commerce Court <br />White Bear Lake, MN <br />5 5 1 1 0 <br />(651)748-1100 <br />NORTH ELEVATION <br />Scale: 1/8" = 1'-0"1 <br />SOUTH ELEVATION <br />Scale: 1/8" = 1'-0"3 <br />TENANT SIGNOWNER SIGN <br />METAL POST AND PURLIN <br />STRUCTURE <br />SCREEN <br />(SEE OPTIONS ABOVE) <br />METAL SIDING <br />WEST ELEVATION <br />Scale: 1/8" = 1'-0"2 19'-0"T.O. SLABEAST ELEVATION <br />Scale: 1/8" = 1'-0"4 <br />TENANT SIGN <br />19'-0"T.O. SLABSCREEN OPTIONS - INSPIRATION IMAGES <br />SCREEN OPTION B: <br />PERFORATED OR EXPANDED METAL PANELS WITH TRANSPARENCY THROUGH PANEL <br />MATERIAL <br />SCREEN OPTION A: <br />MESH FABRIC ON METAL FRAME WITH TRANSPARENCY AND VISIBILITY THROUGH PANEL MATERIAL
The URL can be used to link to this page
Your browser does not support the video tag.