My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stormwater Report.pdf
NewBrighton
>
Commissions
>
Planning
>
Public Hearing Items
>
2020 April 21 Public Hearing Items
>
Benedictine Health Center Rezoning and PRD
>
full plan sets for detailed review
>
Civil
>
Stormwater Report.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 10:25:13 PM
Creation date
4/13/2020 11:45:13 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Benedicting Innsbruck Hydro MN-New Brighton 24-hr S1 2-yr Rainfall=2.84" <br /> Prepared by Sunde Engineering Printed 2/13/2020 <br /> HydroCAD® 10.00-20 s/n 02350 ©2017 HydroCAD Software Solutions LLC Page 20 <br /> Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=940.00' (Free Discharge) <br /> L1=Culvert ( Controls 0.00 cfs) <br /> Tertiary OutFlow Max=0.64 cfs @ 12.22 hrs HW=940.70' (Free Discharge) <br /> AL2=Exfiltration (Exfiltration Controls 0.01 cfs) <br /> 3=Culvert (Inlet Controls 0.64 cfs @ 3.24 fps) <br /> Summary for Pond 10P: existing <br /> Inflow Area = 105,565 sf, 61.71% Impervious, Inflow Depth = 1.78" for 2-yr event <br /> Inflow = 6.75 cfs @ 12.04 hrs, Volume= 15,640 cf <br /> Outflow = 6.75 cfs @ 12.04 hrs, Volume= 15,640 cf, Atten= 0%, Lag= 0.0 min <br /> Primary = 6.75 cfs @ 12.04 hrs, Volume= 15,640 cf <br /> Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs <br /> Peak Elev= 937.73' @ 12.04 hrs <br /> Device Routing Invert Outlet Devices <br /> #1 Primary 936.30' 24.0" Round Culvert <br /> L= 65.0' RCP, sq.cut end projecting, Ke= 0.500 <br /> Inlet/Outlet Invert= 936.30' /936.11' S= 0.0029 '/' Cc= 0.900 <br /> n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf <br /> Primary OutFlow Max=6.59 cfs @ 12.04 hrs HW=937.71' (Free Discharge) <br /> L1=Culvert (Barrel Controls 6.59 cfs @ 3.92 fps) <br /> Summary for Pond 11 P: <br /> Inflow Area = 16,274 sf, 88.82% Impervious, Inflow Depth = 2.33" for 2-yr event <br /> Inflow = 1.33 cfs @ 12.04 hrs, Volume= 3,165 cf <br /> Outflow = 1.33 cfs @ 12.04 hrs, Volume= 3,165 cf, Atten= 0%, Lag= 0.0 min <br /> Primary = 1.33 cfs @ 12.04 hrs, Volume= 3,165 cf <br /> Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs <br /> Peak Elev= 942.96' @ 12.04 hrs <br /> Device Routing Invert Outlet Devices <br /> #1 Primary 942.35' 12.0" Round Culvert L= 8.0' RCP, sq.cut end projecting, Ke= 0.500 <br /> Inlet/ Outlet Invert= 942.35' /942.00' S= 0.0438 '/' Cc= 0.900 <br /> n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.79 sf <br /> Primary OutFlow Max=1.29 cfs @ 12.04 hrs HW=942.95' (Free Discharge) <br /> L1=Culvert (Inlet Controls 1.29 cfs @ 2.63 fps) <br />
The URL can be used to link to this page
Your browser does not support the video tag.