My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stormwater Report.pdf
NewBrighton
>
Commissions
>
Planning
>
Public Hearing Items
>
2020 April 21 Public Hearing Items
>
Benedictine Health Center Rezoning and PRD
>
full plan sets for detailed review
>
Civil
>
Stormwater Report.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 10:25:13 PM
Creation date
4/13/2020 11:45:13 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Benedicting Innsbruck Hydro MN-New Brighton 24-hr S1 2-yr Rainfall=2.84" <br /> Prepared by Sunde Engineering Printed 2/13/2020 <br /> HydroCAD® 10.00-20 s/n 02350 ©2017 HydroCAD Software Solutions LLC Page 23 <br /> Summary for Pond 16P: <br /> Inflow = 0.05 cfs @ 13.07 hrs, Volume= 4,302 cf <br /> Outflow = 0.05 cfs @ 13.07 hrs, Volume= 4,302 cf, Atten= 0%, Lag= 0.0 min <br /> Primary = 0.05 cfs @ 13.07 hrs, Volume= 4,302 cf <br /> Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs <br /> Peak Elev= 1.11' @ 13.07 hrs <br /> Device Routing Invert Outlet Devices _ <br /> #1 Primary 1.00' 12.0" Round Culvert <br /> L= 10.0' RCP, sq.cut end projecting, Ke= 0.500 <br /> Inlet/Outlet Invert= 1.00' /0.00' S= 0.1000 '/' Cc= 0.900 <br /> n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.79 sf <br /> Primary OutFlow Max=0.05 cfs @ 13.07 hrs HW=1.11' (Free Discharge) <br /> L1=Culvert (Inlet Controls 0.05 cfs @ 1.13 fps) <br /> Summary for Pond 17P: <br /> Inflow Area = 2,921 sf, 1.54% Impervious, Inflow Depth = 0.81" for 2-yr event <br /> Inflow = 0.08 cfs @ 12.05 hrs, Volume= 197 cf <br /> Outflow = 0.08 cfs @ 12.05 hrs, Volume= 197 cf, Atten= 0%, Lag= 0.0 min <br /> Primary = 0.08 cfs @ 12.05 hrs, Volume= 197 cf <br /> Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs <br /> Peak Elev= 950.33' @ 12.05 hrs <br /> Device Routing Invert Outlet Devices <br /> #1 Primary 950.20' 12.0" Round Culvert <br /> L= 60.0' RCP, sq.cut end projecting, Ke= 0.500 <br /> Inlet/ Outlet Invert= 950.20' /946.73' S= 0.0578 '/' Cc= 0.900 <br /> n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.79 sf <br /> Primary OutFlow Max=0.08 cfs @ 12.05 hrs HW=950.33' (Free Discharge) <br /> 4-1=Culvert (Inlet Controls 0.08 cfs @ 1.24 fps) <br /> Summary for Pond 18P: <br /> Inflow Area = 5,119 sf, 43.82% Impervious, Inflow Depth = 1.58" for 2-yr event <br /> Inflow = 0.27 cfs @ 12.04 hrs, Volume= 675 cf <br /> Outflow = 0.27 cfs @ 12.04 hrs, Volume= 675 cf, Atten= 0%, Lag= 0.0 min <br /> Primary = 0.27 cfs @ 12.04 hrs, Volume= 675 cf <br /> Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs <br /> Peak Elev= 946.98' @ 12.04 hrs <br /> Device Routing Invert Outlet Devices _ <br /> #1 Primary 946.73' 12.0" Round Culvert <br /> L= 71.0' RCP, sq.cut end projecting, Ke= 0.500 <br /> Inlet/Outlet Invert= 946.73' /942.64' S= 0.0576 '/' Cc= 0.900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.