My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stormwater Report.pdf
NewBrighton
>
Commissions
>
Planning
>
Public Hearing Items
>
2020 April 21 Public Hearing Items
>
Benedictine Health Center Rezoning and PRD
>
full plan sets for detailed review
>
Civil
>
Stormwater Report.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 10:25:13 PM
Creation date
4/13/2020 11:45:13 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Benedicting Innsbruck Hydro MN-New Brighton 24-hr S1 2-yr Rainfall=2.84" <br /> Prepared by Sunde Engineering Printed 2/13/2020 <br /> HydroCAD® 10.00-20 s/n 02350 ©2017 HydroCAD Software Solutions LLC Page 29 <br /> Summary for Link TP: <br /> Inflow Area = 282,344 sf, 57.32% Impervious, Inflow Depth = 1.75" for 2-yr event <br /> Inflow = 2.31 cfs @ 12.05 hrs, Volume= 41,141 cf <br /> Primary = 2.31 cfs @ 12.05 hrs, Volume= 41,141 cf, Atten= 0%, Lag= 0.0 min <br /> Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs <br />
The URL can be used to link to this page
Your browser does not support the video tag.