My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stormwater Report.pdf
NewBrighton
>
Commissions
>
Planning
>
Public Hearing Items
>
2020 April 21 Public Hearing Items
>
Benedictine Health Center Rezoning and PRD
>
full plan sets for detailed review
>
Civil
>
Stormwater Report.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 10:25:13 PM
Creation date
4/13/2020 11:45:13 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Volume required for the East Filtration Basin. <br /> Filtration Area 1(East Basin 8P): <br /> Contributing Impervious Area(A) = 16058 sf <br /> Rainfall Depth (P)= 1.1 in <br /> Infiltration Rate(I)= 0.8 in/hr <br /> Draw Down Time(T)= 48 hr <br /> Filtration Factor (F) = 05 <br /> Volume Required= (P)*(A) <br /> F <br /> Vol,req = 2944 cf <br /> Volume Provided @ Outlet= 3717 cf <br /> Surface Area Required = Vol,req <br /> (I)*(T) <br /> SA,req= 920 sf <br /> Surface Area Provided= 1260 sf <br /> Drawdown Time= Vol,provided <br /> (SA,provided) *(I) <br /> Drawdown Time= 44 hrs <br /> *See Attached Stage-Storage Table 8P for Details <br />
The URL can be used to link to this page
Your browser does not support the video tag.