SWPPP CONTACT INFORMATION AND CHAIN OF RESPONSIBILITY ESTIMATED PRELIMINARY EROSION AND SOIL DATA <br /> SEDIMENT CONTROL BMP QUANTITIES* MAP UNIT HYDROLOGIC PORTION <br /> ROLE AGENCY POSITION CONTACT PERSON PHONE NUMBERS ITEM QUANTITY MAP UNIT NAME POPE <br /> / SYMBOL SOIL GROUP OF SITE <br /> CONSTRUCTION SITE MANAGER Temporary Rock Construction 1 <br /> Entrance 132E HAYDEN FINE SANDY LAOM B 53.20% ARCHITECTS <br /> Silt Sack Inlet Protection 29 <br /> Erosion Control Blanket 18,886 SQ. FT. 342 KINGSLEY SANDY LOAM C 21.50% <br /> CONSTRUCTION SITE INSTALLER Stone Riprop 17 CU. YD. URBAN LAND—HAYDEN—KINGSLEY <br /> Siltfence 365 LF 860E COMPLEX N/A 25.40% <br /> DEVELOPER Yanik Companies Chester Yanik Bio Logs <br /> p (952) 471—9199 office <br /> Developer (952) 471-9196 fax Temporary Seed Mixture <br /> Fertilizer for Temporary POPE ARCHITECTS,INC. <br /> Seeding 1295 BANDANA BLVD N,SUITE 200 <br /> ST.PAUL,MN 55108-2735 <br /> CERTIFIED SWPPP DESIGNER SUNDE ENGINEERING, PLLC. Brian Mundstock (952) 881-3344 office Permanent Seed Mixture (651)642-9200 I FAX(651)642-1101 <br /> 10830 Nesbitt Avenue South (952) 881-1913 fax AREA TABULATIONS <br /> Bloomington, MN 55437 Fertilizer for Permanent www.popearch.com <br /> SWPPP Designer Seeding 282,344 SQ. FT. <br /> EROSION CONTROL INSPECTOR Permanent Pond Skimmer DISTURBED AREA <br /> Structures PRE—CONSTRUCTION 153,659 SQ. FT. YANIK COMPANIES <br /> Temporary Sedimentation IMPERVIOUS AREA <br /> Basin Outlet Surface Skimmer POST—CONSTRUCTION 159,643 SQ. FT. BHS INNSBRUCK <br /> Concrete Washout 1 IMPERVIOUS AREA <br /> NET CHANGE IN IMPERVIOUS 5,984 SQ. FT. SENIOR HOUSING <br /> * Party responsible for long term operation and maintenance of the permanent MREA NEW BRIGHTON MN <br /> stormwater management system. * Note: BMP quantities are for informational purposes only f <br /> and are subject to change. The Contractor shall not rely No groundwater encountered to a depth of xx feet. <br /> ** Party responsible for overseeing the implementation of the SWPPP. on these quantities for their bid. The Civil Engineer is not <br /> responsible for cost estimates or actual construction costs. <br /> The Contractor shall determine for themselves the exact <br /> quantities for bidding and construction. The Contractor <br /> shall provide additional temporary BMPs as necessary based <br /> on actual site conditions. <br /> EROSION AND SEDIMENT CONTROL DEVICE OPERATION SCHEDULE <br /> ITEM INSTALLATION INSPECTION/MAINTENANCE REMOVAL <br /> Siltfence Install prior to any Inspect a minimum of once After disturbed areas have <br /> CONSTRUCTION SEQUENCE construction. every 7 days or 24 hours been stabilized. <br /> after a rain event greater <br /> Delineate the location of areas not to be disturbed (e.g. with flags, stakes, signs, than 0.pe inches in a <br /> 1 24—hour period. Remove o <br /> silt fence, etc.) before work begins. <br /> sediments as required. <br /> Repair, replace, or <br /> Establish sediment control practices on at down gradient perimeters before any up supplement non—functional <br /> 2 gradient land disturbing activities begin. These practices shall remain in place until RECEIVING WATERS siltfence within 24 hours of (5und e1 <br /> final stabilization has been established. discovery. O Engineering,vLL <br /> 3 Install temporary rock construction entrances. Temporary Rock Construction Install prior to any Inspect daily. Maintain as When site paving operations <br /> SURFACE WATER, WETLAND, OR SPECIAL OR Entrance construction. required. Inspect for begin. lalY <br /> STORMWATER POND WITHIN 1 MILE APPROVED evidence of off—site sediment <br /> Install allperimeter sediment control devices. The timingof the installation of IMPAIRED IMPAIRMENT <br /> OF SITE THAT RECEIVED TMDL tracking. Remove any <br /> 4 sediment control practices may be adjusted in order to accommodate short—term WATER <br /> STORMWATER RUNOFF FROM SITE tracked sediment on a daily CONSULTING CIVIL ENGINEERS <br /> activities, but sediment control practices must be installed before the next basis. 0830 NESBITr AVENUE SOUTH <br /> precipitation event even if the short—term activity is not complete. BL l*S2l e1-33a4ITELEPHONSE�r <br /> Storm Sewer Inlet Protection Install prior to any Inspect a minimum of once After disturbed areas have ISsxl eer-Isla FAX <br /> — PIKE LAKE IMPAIRED AOL, AQR CI—Nutrients construction or same day every 7 days or 24 hours been stabilized. ""'".'°ndBOI"I.°orn <br /> 5 Contact the City and/or Watershed District for approval of the sediment control that the structure is after a rain event greater <br /> devices. SOUTH LONG LAKE IMPAIRED AQC, AQL, AND CI—Hg—F; constructed. Install on all than 0.5—inches in a <br /> 6 Clear and grub the site. AQR Nutrients existing and proposed catch 24—hour period. Remove <br /> basins exposed to sediments as required. Make <br /> 7 Strip and stockpile topsoil. UNNAMED IMPAIRED AQR NONE construction sediment. any necessary repairs within <br /> 8 Remove pavements and utilities. 24 hours of discovery. <br /> 9 Install temporary culverts. Temporary or Permanent Install prior to rough grading. Inspect a minimum of once N/A <br /> 10 Install temporary sedimentation basins and outlet structures. Stormwater Pond Direct surface water runoff to every 7 days or 24 hours <br /> P Y _ the pond. after a rain event greater <br /> 11 CO <br /> Construct the stormwater management ponding. period. <br /> than inches in a <br /> 24—hour peri Drain pond <br /> RAINFALL DATA COLLECTION SYSTEM : and remove sediment when <br /> Install erosion prevention and sediment controls in order to keep sediment away Rainfall data must be collected bymaintained raininstalled onsite, a weather station within the depth of sediment <br /> 12 a properly m gauge <br /> from infiltration areas. 1 mile of the site, or a weather reporting system that provides site specific rainfall data from radar collected in the basin reaches <br /> 13 Rough grade the site. summaries. 1/2the storage volume. O <br /> The rainfall collection system used onsite shall be: Drainage and removal must <br /> 14 Install utilities. be completed within 72 hours CITY <br /> of discovery. / <br /> 15 Install building foundations. V SUBMITTAL <br /> Temporary or Permanent Soil Install within 14 calendar Inspect a minimum of once N/A <br /> 16 Install curb and gutter. Stabilization days (7 calendar days for every 7 days or 24 hours <br /> 17 Install pavements and sidewalks. impaired waters) of the initial after a rain event greater 2/14/20 <br /> 18 Perform finished grading. soil disturbance for all than 0.5—inches in a <br /> unworked exposed soil areas. 24—hour period. Make any Ct <br /> 19 Install lawn and landscape. necessary repairs within 24 O <br /> hours of discovery. <br /> 20 Restore all disturbed areas. Sod or seed with mulch or blanket. Protection of Temporary Immediately install siltfence, Inspect a minimum of once After stockpiles have been <br /> 21 Install bia—roll barriers in finished graded areas as required. Stockpiles or other effective sediment every 7 days or 24 hours removed. <br /> controls, around all temporary after a rain event greaterLL <br /> 22 Remove accumulated sediment from basins. Clean all storm sewer and conveyance soil stockpiles. than 0.5—inches in a <br /> systems. 24—hour period. Remove <br /> After all disturbed areas are stabilized, obtain approval from the City and/or sediments as required. Make <br /> 23 any necessary repairs within I HEREBY CERTIFY THAT THIS PLAN, <br /> Watershed District. 24 hours of discovery. SPECIFICATION,OR REPORT WAS PREPARED <br /> BY ME OR UNDER MY DIRECT SUPERVISION <br /> 24 Remove all temporary sediment control devices. — O AND THAT I AM A DULY LICENSED <br /> Temporary or Permanent Install within 24 hours: 200 Inspect a minimum of once N/A PROFESSIONAL ENGINEER UNDER THE LAWS <br /> Submit notice of termination (NOT) to the MPCA within 30 days after all activities Drainage Ditch Stabilization lineal feet from the point of every 7 days or 24 hours OF THE STATE OF MINNESOTA. <br /> 25 discharge. Install within 14 after a rain event greater <br /> required for final stabilization are complete. <br /> calendar days (7 calendar than 0.5—inches in a <br /> days for impaired waters): 24—hour period. Make any Z Mike R.Keeller <br /> beyond 200 lineal feet from necessary repairs within 24 DATE:2114/20 REG.NO.: aa4zs <br /> the point of discharge. hours of discovery. <br /> Temporary or Permanent Install within 24 hours. Inspect a minimum of once N/A <br /> Energy Dissipation at Pipe every 7 days or 24 hours <br /> Outlets after a rain event greater <br /> GENERAL REQUIREMENTS : <br /> than 0.5—inches in a <br /> 24—hour period. Make any <br /> 1. Apply for and obtain the GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY from necessary repairs within 24 <br /> the Minnesota Pollution Control Agency. hours of discovery. <br /> Issues <br /> Protection of Surface Waters N/A Inspect a minimum of once N/A and <br /> 2. Perform all construction activity in accordance with the Minnesota Pollution Control (Including drainage ditches every 7 days or 24 hours <br /> Agency GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY issued August 1, 2018 and conveyance systems) after a rain event greater Revisions: <br /> and all subsequent amendments thereto. than 0.5—inches in a <br /> 24—hour period. Remove all <br /> 3. Stormwater Pollution Prevention Plan (SWPPP): The SWPPP includes this narrative, the deltas and sediment <br /> Grading, Utility, and Erosion Control Plans, Notes and Detail sheets, and Stormwater deposited. Restabilize the <br /> Management Calculations. areas where sediment removal <br /> results in exposed soil. <br /> 4. Keep a copy of the SWPPP, all changes to it, and inspections and maintenance records Remove and stascoe within 7 <br /> at the site during the construction. The SWPPP must be available for review. The days of discovery. <br /> SWPPP can be kept in the field office or an on—site vehicle. If there will not be a Protection of Infiltration Areas N/A Inspect a minimum of once N/A <br /> trailer or a project manager on site, then place the SWPPP in an accessible on—site every 7 days or 24 hours <br /> container. after a rain event greater <br /> than 0.5—inches in a <br /> 5. The Contractor must designate a person knowledgeable and experienced in the application 24—hour period. Ensure that <br /> ng <br /> of erosion prevention and sediment control BMPs who will oversee the implementation of not sediment activityi oneachi <br /> the SWPPP, and the installation, inspection, and maintenance of the erosion prevention c ther infiltrationnfiltr r is reaching <br /> hieg <br /> and sediment control BMPs before and during construction. the eo area and the <br /> area is protected from <br /> compaction due to <br /> 6. The person who will oversee implementation of the SWPPP must have daily access to the construction traffic. <br /> SWPPP documentation. <br /> 7. Individuals preparing the SWPPP for the project, overseeing implementation of the SWPPP, STORMWATER <br /> revising and amending the SWPPP, and at least one individual on the project performing <br /> installation, inspection, maintenance, and repairs of BMP's must be trained. The training POLLUTION <br /> must be done by a local, state, federal agencies; professional organization; or other <br /> entities with expertise in erosion prevention, sediment control, or permanent storm water PREVENTION PLAN <br /> management. Training documentation must be in or with the SWPPP or be available <br /> within 72 hours upon request. <br /> 8. The Owner must keep all records in regards to the SWPPP, any stormwater permits <br /> required, all records of inspections and maintenance, and the Stormwater Management <br /> Calculations for 3 years after the submittal of the Notice of Termination (NOT). <br /> SHEET <br /> 01 .4 <br />