My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.01.08 CC Packet
NewBrighton
>
Council
>
Packets
>
2019
>
2019.01.08 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:39:57 AM
Creation date
9/11/2020 2:39:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 11, 2018 Page 6 of 10 <br /> <br /> Community Assets and Development Director Schlichting reported some of the more significant changes to <br />assumptions from the last analysis include: <br /> <br /> The classification of townhomes are categorized as residential property versus “other property” and <br />charged respectively for water and sewer. For the purposes of stormwater and street light charges, <br />each townhome unit/address will be charged the same as a single-family unit. <br /> Projections for the New Brighton Elementary Development were added to the analysis starting in the <br />year 2021. <br /> Due to failing street conditions, the Apache Hills Street reconstruction project’s priority was <br />increased to be reconstructed in 2019 versus 2023 as originally scheduled. The water infrastructure <br />cost difference between the Apache Hills project and the originally planned West Long Lake Area is <br />$1,210,000. This along with the capital improvement long-term strategy changes below, created the <br />need for a $2,500,000 5-year loan at 4% interest with the Municipal Development fund. <br /> Water Fund capital improvement changes include the increase in priority and movement of the <br />repainting of the 5th Street Storage Reservoir from 2023 to 2021 along with an increased cost of <br />$450,000. Two Old Highway 8 Watermain upgrades were brought forward to be completed in 2021 <br />and 2022 with an additional price of $355,000. The South Water Tower re-painting project was <br />reprioritized and moved back from 2029 to 2034. <br /> A new sewer rate has been created for properties classified as non-residential or “other”. <br /> The annual cost of sewer lining increased from $100,000 to $200,000. <br /> Re-lamping all the remaining streetlights with LED technology were re-prioritized and moved up in <br />the long-term plan to be completed in 2020. <br /> <br />Finance Director Davitt indicated water and sewer charges are based upon water usage, while stormwater and <br />streetlights are flat charges. Water consumption is metered and is read quarterly. Sewer charges for <br />residential properties without metered irrigation are based upon the customer’s water consumption during <br />their “winter quarter”. The quarterly sewer charges are then “fixed” for the summer months and adjusted <br />again the next year based on the next “winter quarter”. <br />Community Assets and Development Director Schlichting stated water and sewer have a “flat rate” <br />component built into the charges. The flat rate is established to pay for the fixed costs of delivering both water <br />and sewer services to the property regardless of the how much of those services are used by the property. The <br />water distribution system and the sanitary sewer collection system need to be maintained regardless of <br />customer’s specific usage during any particular quarter. The flat rate charges are calculated based on a fixed <br />number of gallons. Currently, the flat rate is calculated on 8,000 gallons. The variable “per 1,000 gallons” <br />water charge starts with consumption levels above this flat rate. The proposed flat rates for single, two-family, <br />and townhome residences was reviewed. <br />Finance Director Davitt discussed a table with the current utility rates compared to the proposed rates for <br />2019. She provided a comparison of the City’s rates to neighboring communities. It was noted the water and <br />sewer rates are per 1,000 gallons. The stormwater and street light rates are flat quarterly charges for a single, <br />two-family, and townhome residence. Staff provided further comment on the proposed utility rates and <br />recommended Council approval. <br />Councilmember Burg thanked staff for the thorough report and commented further on the expense the City <br />had to provide City water and sewer services. <br />Councilmember Jacobsen discussed how the City’s utility rates set a firm foundation for the City. City <br />Manager Lotter thanked his staff for their work on the utility rates and thanked the Council for supporting the <br />City’s long-term vision. <br /> <br />5 Ayes, 0 Nays-Motion Carried <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.