My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.12.10 CC Packet
NewBrighton
>
Council
>
Packets
>
2019
>
2019.12.10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:40:08 AM
Creation date
12/28/2020 9:44:38 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Brighton 2020 Fee Schedule <br /> BUILDING PERMITS: <br /> Description 2020 <br /> GENERAL WORK: BUILDING/FIRE SPRINKLER AND ALARM FEES <br /> Building permit issuance charge (Base Charge) $31.00 <br /> Sprinkler permit issuance charge (Base fee) $31.00 <br /> Value of Work (Additional Charge): <br /> $1 to $500 $31.00 <br /> $501 to $2,000 $31.00 for the first $500 plus $3.80 for each add'l $100 or fraction thereof up to & <br />including $2,000 <br /> $2,001 to $25,000 $88.00 for the first $2,000 plus $18.00 for each add'l $1,000 or fraction thereof up <br />to & including $25,000 <br /> $25,001 to $50,000 $488.00 for the first $25,000 plus $12.50 for each add'l $1,000 or fraction thereof <br />up to & including $50,000 <br /> $50,001 to $100,000 $804.50 for the first $50,000 plus $8.50 for each add'l $1,000 or fraction thereof up <br />to & including $100,000 <br /> $100,001 to $500,000 $1,249.00 for the first $100,000 plus $7.00 for each add'l $1,000 or fraction thereof <br />up to & including $500,000 <br /> $500,001 to $1,000,000 $4,091.00 for the first $500,000 plus $5.60 for each add'l $1,000 or fraction thereof <br />up to & including $1,000,000 <br /> $1,000,001 and up $6,985.60 for the first $1,000,000 plus $4.50 for each add'l $1,000 or fraction <br />thereof. <br /> Residential plan review fee 50% of permit fee (does not apply on jobs valued at less than $200.00) <br /> Commercial plan review fee due at the time plan is dropped off 65% of permit fee <br /> Accelerated review (Total x 2) Review completed within 15 business days or ½ of the <br />submitted fee refunded <br /> Administrative Fee $17.00 <br /> State Surcharge Fee .0005% x valuation of job (minimum fee = $1.00) <br /> Replacement inspection record card. $17.00 <br /> Restamping job site plan sets $27.00 <br /> Footing/foundation permit prior to full permit issuance <br /> - Residential & Commercial Based on Valuation of a full building permit, minus the plan review, plus a full <br />building permit upon the issuance of the shell permit. <br /> Certificate of Occupancy <br /> - Temporary/Conditional Certificate of Occupancy $500.00 plus a letter of credit equal to the remaining zoning requirements <br /> - Full Certificate of Occupancy $16.00 <br /> Site Assessment for Fire Works $100.00 <br /> Temp Membrane Structure, Tents & Canopies - Greater than 120 Sq Ft $88.50 <br /> Demolition $79.00 flat fee for residential, valuation based for non-residential with $79 <br />minimum fee
The URL can be used to link to this page
Your browser does not support the video tag.