Laserfiche WebLink
New Brighton 2020 Fee Schedule <br /> BUILDING PERMITS: <br /> Description 2020 <br /> ELECTRICAL FEES <br /> Administrative Fee $17.00 <br />Residential panel replacement $110.00 <br />sub panel $45.00 <br />New service or power supply is: <br />0 to 300 AMP $55.00 <br />400 AMP $71.00 <br />500 AMP $87.00 <br />600 AMP $103.00 <br />800 AMP $135.00 <br />1000 AMP $167.00 <br />Each additional 100 Amps $16.00 <br />Circuits & Feeders <br />0 - 100 Amp $9.00 <br />101 - 200 Amp $15.00 <br />201 - 300 Amp $21.00 <br />301 - 400 Amp $27.00 <br />401 - 500 Amp $33.00 <br />501 - 600 Amp $39.00 <br />Apartment Buildings <br />Fee per unit of an apartment or condominium complex <br />(this does not cover service, unit feeders, or house panels)$80.00 <br />Swimming Pools and Hot Tubs <br />Fee including 2 inspections $90.00 <br />Plus circuits (fee per each) $9.00 <br />Additions, Remodels, or Basement Refinishes <br />Fee includes up to 10 circuits and 2 inspections $90.00 <br />Residential Accessory Structures The greater of $55.00 for panel plus $9.00 per circuit or $90 for 2 inspections <br />Traffic Signals (per each standard)$8.00 <br />Street and Parking Lot Lights (per each standard)$5.00 <br />Transformers and Generators <br />up to 10 kva $5.00 <br />11 kva to 74 kva $45.00 <br />75 kva to 299 kva $60.00 <br />over 299 kva $165.00 <br />HOMEOWNERS AND ELECTRICAL CONTRACTORS must complete an electrical permit form available from the Building Inspections Division. Add $1.00 for State <br />surcharge to total cost of each permit. The fee is the total of the listed fees OR the total number of inspection trips x $45.00, whichever is greater <br />Minimum Fee: minimum permit fee is $40.00 plus $1.00 State surcharge. This is for one inspection only. Minimum fee for rough-in and final inpsection is $90.00 plus $1.00 <br />State surcharge <br />Maximum Fee: Maximum fee for single family dwelling or townhouse not over 200 amps (no max if service is over 200 amps) is $190.00 plus $1.00 State surcharge. Maximum <br />of 2 rought-in's and 1 final inspection. Failed inspections are an additional $45.00 each