Laserfiche WebLink
<br /> <br />Page 5 <br />May 11, 2018 <br />629 Old Highway 8 NW, New Brighton MN <br />Project: 5-14-18 <br /> <br /> <br /> <br /> <br />D. Discussion <br /> <br />D.1. Asbestos-Containing Materials <br /> <br />The inspection and survey for the purpose of demolition located asbestos containing materials that will be <br />impacted by the upcoming work. <br /> <br />Asbestos containing sink insulation located in the break room sink. <br /> <br /> E. Remarks <br /> <br />In any building the potential exists for asbestos-building materials to be located inside walls, above <br />ceilings, under floors, and other inaccessible areas. This inspection attempted to identify asbestos building <br />materials in these inaccessible areas. However, it was not feasible to inspect 100 percent of these areas. <br />Also, the potential exists for asbestos materials to be found outside the building buried underground. TL <br />Erickson Enterprises, LLC cannot be held responsible for the presence of any such hidden materials. In the <br />case of demolition, contractors involved in the project should be made aware of this potential. If p reviously <br />unidentified suspect asbestos building materials are exposed during their activities, they should be sampled <br />and analyzed for content prior to disturbance. Services performed by TL Erickson Enterprises, LLC for <br />this project have been conducted in a manner consistent with the level of care ordinarily exercised by <br />members of the profession currently practicing in the area under similar budget and time constraints. No <br />warranty, expressed or implied, is made. Bulk asbestos analysis was conducted in accordance with the <br />Environmental Protection Agency’s (EPA Method 40 CFR, Chapter 1, Part 763, Subpart F, and Appendix <br />A (7/1/87 Edition). Detailed quality control information is available upon request. Bulk samples are <br />retained at the laboratory for 30 days and then disposed of, unless instructed otherwise. <br />F. Asbestos Building Inspector Certification <br /> <br />I, the undersigned, do hereby certify that I am an accredited Asbestos Building Inspector in the State of <br />Minnesota. A photocopy of my current asbestos inspector certificate is attached to this section. <br /> <br />Signature: _______________________________ Date: May 11, 2018 <br /> Todd Erickson Inspector # AI 523 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />