My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.07.03 EDC Packet
NewBrighton
>
Commissions
>
EDC
>
EDC Packets
>
2019
>
2019.07.03 EDC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 4:07:35 PM
Creation date
1/25/2021 3:43:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />Page 2 <br />October 13, 2017 <br />Project: 10-121-17 <br /> <br /> <br />A. Scope of Services <br /> <br />The scope of our services was limited to: <br /> <br /> Visually examine accessible areas and identify the locations of suspect asbestos containing building <br />materials (ACBM). <br /> Collect and have analyzed representative bulk samples of materials suspected of containing asbestos. <br />Examples of materials collected for analysis included: (list of materials) <br /> <br />B. Site Description <br /> <br />The Site is an Operating Church building that had been previously a school. The building is a split level <br />style structure on the north end and a slab on grad structure on the south end. The South end appeared to be <br />of a later addition and building style. <br /> <br />The North end of the building has an upper and lower level. The upper level is heated through a duct <br />system that is located in the plenum of the building. The lower level has duct work in the walls that was <br />observed to be insulated in various location. The ductwork that is visible in the lower level is not insulated <br />from the old boiler room. <br /> <br />The north end of the building also has a chapel that is a newer structure this is a single level structure. <br /> <br />The South end of the building is a slab on grade building with a tunnel system that contains the heating <br />system. The south end is heated by radiant heat from the boilers. <br /> <br />The roof is a flat level roof that the exposed area was sampled. Due to the age and of the roof, no samples <br />were obtained from under the rubber roof system. As this is an operating building, no guarantee that the <br />roof system could be sealed back to existing condition limited the sampling to surface materials. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.