My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.08.07 EDC Packet
NewBrighton
>
Commissions
>
EDC
>
EDC Packets
>
2019
>
2019.08.07 EDC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 4:07:35 PM
Creation date
1/25/2021 3:54:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Traffic Impact Study 8 <br />New Brighton Exchange Update <br />3. Forecasted Traffic <br />a. Proposed Development <br />Figure 3 below shows the concept development plan for this area from the 2014 TIS. <br />At the time of the traffic counts from the 2014 TIS, sections C and G -1 were built and <br />occupied. Currently, sections A, C, D, G-1, G-2, H and I are built and occupied. That <br />leaves sections B, E, F and G-3 remaining to be developed. <br /> <br />Figure 3 – Concept Development Plan <br /> <br />Per the 2014 TIS, the remaining undeveloped sections are proposed to be as follows: <br />• Section B: 96,000 square feet of office <br />• Section E: 36,000 square feet of office <br />• Section F: 130,000 square feet of office and 15,000 square feet of retail <br />• Section G-3: 35,000 square feet of office <br /> <br />As in the 2014 TIS, the future analysis year will be 2033. It is as sumed all parcels will <br />be fully developed by then.
The URL can be used to link to this page
Your browser does not support the video tag.