My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.08.07 EDC Packet
NewBrighton
>
Commissions
>
EDC
>
EDC Packets
>
2019
>
2019.08.07 EDC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 4:07:35 PM
Creation date
1/25/2021 3:54:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />REQUEST FOR COMMISISON CONSIDERATION <br /> <br />ITEM DESCRIPTION: CSI Potential Expansion / Exchange Area Traffic Study Updates <br />DEPARTMENT HEAD’S APPROVAL: <br />CITY MANAGER’S APPROVAL: <br />No comments to supplement this report ___ Comments attached ___ <br /> <br />Recommendations: No action required at this time. <br /> <br />History: June 2014: PUD approved allowing initial construction of CSI with an <br />option to expand on adjacent land by the end of May 2017. <br /> May 2017: Extension of the option period exercised through the end of <br />May 2019. <br /> May 2019: Extension of the option period exercised a third and final time; <br />option currently runs through May 31, 2021. <br /> <br />Expansion Plan: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> In May of this year, CSI exercised their third and final option on the land to <br />the north of their current corporate headquarters within the New Brighton <br />Exchange, and all indications are the City may see a proposed expansion of <br />the facility within the coming year (see Attachment A). As currently <br />envisioned, a 60,000 square foot addition would be placed on the northern <br />side of the existing building with an additional 800 net parking stalls placed <br />on the remainder of the land as well as some additional acreage from the <br />neighboring Block B. There are no concerns that expansion into Block B <br />will pose problems for the future development of that area, and it may <br />make the land more attractive to CSI should they have further expansion <br />plans moving forward. Staff will continue to explore such possibilities in <br />the future. <br /> Prior to the original facility opening in 2015, Spack Consulting (a company <br />that specializes in Traffic studies) completed an analysis of the area to <br />determine future traffic control needs upon full development within the <br />New Brighton Exchange. With the Exchange nearing full build out, the <br />study was revisited to see if the recommendation of a traffic signal at Old <br />Highway 8 / 14th Street is still valid, and whether the configuration of Old <br />Agenda Section: VI <br />Item: 2 <br />Report Date: 07/31/19 <br /> Commission Meeting Date: 08/07/19
The URL can be used to link to this page
Your browser does not support the video tag.