My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.06.05 PREC Packet
NewBrighton
>
Commissions
>
Parks and Recreation
>
Parks and Rec Packets
>
2019
>
2019.06.05 PREC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 2:15:26 PM
Creation date
2/3/2021 11:46:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RICE CREEK NORTH REGIONAL TRAIL MASTER PLAN | 15 <br />• Bridge linking the Regional Trail to Long Lake Regional Park and the Rice Creek West Regional Trail <br />Overall the Rice Creek North Regional Trail currently contains: <br />• 7.75 miles of bituminous trail <br />• 1.24 miles of combined cross country ski and hiking trails <br />• 5.9 miles of navigable water as part of the Rice Creek Water Trail <br />• 3 Canoe and kayak launch sites to the water trail <br />• 2 dedicated trailheads with parking for 67 vehicles <br />• 1 Restroom building at the Lexington Avenue North Trailhead <br />• 8 additional community access points <br />• Links with the greater metropolitan parks and trails system including: <br /> -Long Lake Regional Park <br /> -Rice Creek West Regional Trail <br /> -Rice Creek North Regional Trail (Anoka County) <br /> -Rice Creek Chain of Lakes Park Reserve <br /> -East Anoka County Regional Trail <br />Pine Entrance to North Segment
The URL can be used to link to this page
Your browser does not support the video tag.