My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020.08.05 PREC Packet
NewBrighton
>
Commissions
>
Parks and Recreation
>
Parks and Rec Packets
>
2020
>
2020.08.05 PREC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2021 4:05:39 PM
Creation date
2/12/2021 2:50:27 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Summary 2CITY OF NEW BRIGHTON PARK AND TRAIL SYSTEM MASTER PLAN - DRAFT <br />Planning Process <br />A year-long planning process began with a project start-up meeting with city staff to explore <br />goals, objectives and gather important city data. A critical piece of this plan was community <br />engagement, which started immediately and was used to raise awareness of the project in <br />order to understand the viewpoints of the residents to ensure the plan aligned with community <br />sentiment and identified needs. At this stage, input was solicited through various channels, <br />including an interactive online engagement platform, city social media, in-person interviews, and <br />attendance at various community events. <br />The use of a steering committee with community members that represented varying <br />organizations and viewpoints was included to provide additional community outreach, raise <br />project awareness, develop goals and policies, and guide the decision-making process. Data <br />collection and system evaluations were also conducted to understand the existing quality and <br />condition of the parks, trails and recreation within New Brighton. <br />The findings and analysis from the engagement and data collection process provided <br />guidance to the development of preliminary recommendations and concept plans in the draft <br />system master plan. The draft master plan went through a comment and review process for <br />further refinement and confirmation of priorities were evaluated for inclusion into the final <br />system master plan report, presented and adopted by the City of New Brighton on ____, <br />to be submitted to the Metropolitan Council as an amendment to the New Brighton 2040 <br />Comprehensive Plan. <br />Project Start- <br />Up <br />Inventory and <br />Data Collection <br />Community <br />Engagement <br />Analysis and Draft <br />Master Plan <br />Final Plan <br />Primary Goals and Initiatives <br />The following goals and initiatives, in alignment with the 2040 Comprehensive Plan, were <br />prepared as a guide for establishing both short and long term priorities for the parks, trails and <br />recreation programs to better meet the needs and desires of the community over the next 20 <br />years. <br />1. Strengthen Community Connections <br />2. Create Spaces to Gather & Interact <br />3. Celebrate Parks as Neighborhood Activity Centers <br />4. Create a Sense of Place and Feeling of <br />Community <br />5. Safe, Comfortable & Attractive Streets <br />6. Sustain Fiscal & Environmental Responsibility
The URL can be used to link to this page
Your browser does not support the video tag.