My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020.08.05 PREC Packet
NewBrighton
>
Commissions
>
Parks and Recreation
>
Parks and Rec Packets
>
2020
>
2020.08.05 PREC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2021 4:05:39 PM
Creation date
2/12/2021 2:50:27 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assessment of Need 26CITY OF NEW BRIGHTON PARK AND TRAIL SYSTEM MASTER PLAN - DRAFT <br />ATHLETIC ASSESSMENT <br />The planning study focused on assessing the existing athletics and making recommendations <br />for continued improvements to better meet the local athletic needs. Athletic facilities within <br />New Brighton were analyzed to determine available capacity, geographical location and overall <br />condition. While the planning process included some input from the school district and the city’s <br />recreational programming, more in-depth data was not able to be gathered for usage analysis <br />and therefore, the city should continue to reach out to local stakeholders and associations prior <br />to making any decisions on improvements or modifications to athletic facilities. <br />The recommendations of this system plan are primarily based on evaluations of existing <br />athletic facilities on city park property and any changes <br />to athletic facilities and programming will need to <br />be monitored to ensure that the future recreational <br />needs are being met according to current trends and <br />participation rates. The recommendations provide <br />suggestions for balancing the types of athletics available, <br />as well as improving conditions of facilities. <br />Any changes to athletic facilities and programming will <br />need to be monitored to ensure that future recreational <br />needs are being met. Stakeholders were identified in <br />the process and asked to provide comments regarding <br />programming and use of field sites in New Brighton. <br />A real baseball field that <br />drains normally from <br />rainstorms. The fields are <br />in poor shape especially <br />compared to other parks <br />we play at in surrounding <br />communities. <br />ATHLETIC <br />ASSESSMENT 1
The URL can be used to link to this page
Your browser does not support the video tag.