Laserfiche WebLink
<br /> <br />December 14, 2018 <br /> <br />Ben Gozola <br />City of New Brighton Planning Commission <br />803 Old Highway 8 Northwest <br />New Brighton, Minnesota 55112 <br /> <br />Re: Independent School District #621 Mounds View Public Schools <br />Irondale High School Additions and Renovations Narrative <br />Commission No. 172257 <br /> <br />Dear Ben: <br /> <br />Independent School District #621 is submitting the following project narrative in compliance <br />with the Land Use Application requirements for the Irondale High School Additions and <br />Renovation project. <br /> <br />Scope of Work: As part of the approved 2017 Referendum, Mounds View School District, with <br />input from students, staff, and community, plan to renovate and add onto Irondale High <br />School. The design encourages a sense of community and student ownership through creating <br />new and more flexible physical environments designed to support the schools core values. The <br />school project creates a welcome, comfortable, safe and secure place where students can <br />embrace who they are. <br /> <br />The school plans to add a new auditorium to the south side of the building. The new <br />auditorium will address a growing student population as well as pro vide the space and <br />technology integral to a contemporary high school auditorium. The new auditorium will <br />provide a total of 642 seats. Brick and precast that matches the existing school building will be <br />incorporated into the new exterior of the auditorium. Exterior metal panels and accent lighting <br />designs draws from the history of New Brighton and the iron mill that spurred the <br />development of the area. <br /> <br />Additionally, two classroom additions are proposed. The first classroom addition is located on <br />the west side of the existing building and the second addition will occupy a portion of the <br />existing courtyard. The main office addition will be relocated on the south side of the main <br />gym to accommodate the new auditorium as well as provide a new secured entry vestibule. <br />The additions draws from the design and materials of the existing building while bringing in <br />more natural light and supporting flexible educational environments. <br /> <br />Finally, the scope of work includes major renovations to portions of the interior of the existing <br />building. The primary purpose of the renovations is to alleviate congestion within the hallway <br />intersections and repurpose existing spaces to better facilitate student needs. The expansion of <br />the hallway intersections will displace classrooms, which will be relocated within the existing <br />building. With a new pool planned for Edgewood Middle School, the existing high school pool <br />will be converted into a new fitness room. The existing auditorium will be reconfigured into a <br />new multipurpose room. The main lobby will be expanded into a new commons and <br />auditorium lobby with support spaces for student and community use. <br />