My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.11.19 Planning Commission
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2019
>
2019.11.19 Planning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 1:56:12 PM
Creation date
2/16/2021 1:15:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Midtown Village August 20, 2019 <br />Response to City of New Brighton Comments <br /> <br />Prepared by Loucks 3 of 5 <br /> <br />3. City discussed demo/abatement of buildings, indicate areas not completed by dominium to <br />be by others. Noting trees, fencing, bituminous, and other items will remain the <br />responsibility of Dominium’s contractor. <br />Response: Note updated to “DEMO WITHIN ADJACENT DEVELOPMENT TO BE <br />COORDINATED WITH CITY & PULTE”. <br /> <br />4. Show 6th Avenue NW and utilities within street corridor. Coordination may be required <br />with residents along 6th Avenue NW during watermain work. More detail is required <br />where watermain is being removed and where existing watermain terminates. <br />Response: Watermain to be removed to property line and plugged. <br /> <br />Sheet C2-1 <br /> <br />1. B618 curb and gutter on 8th Avenue Extension. <br />Response: B618 Curb and gutter specified along 8th Ave. NW. <br /> <br />2. 8th Ave extension to be adjusted based on Kimley Horn draft plan for future signal. <br />Response: Please provide referenced Kimley Horn plans. <br /> <br />3. New fence to be installed adjacent to PW facility. <br />Response: New fence will be provided. See BKV landscape plans. <br /> <br />4. Adjust property line for salt building to remain. <br />Response: Details of salt building along-side development, are being worked through. <br /> <br />5. Add ROW for 7th St extension and snow storage on north site. <br />Response: Right of way added. <br /> <br />6. Extend sidewalk to south line of ROW for 8th Avenue Extension. <br />Response: Sidewalk extended south. <br /> <br />7. Crosswalks and work within Old Highway 8 ROW require county permits and approval. <br /> Response: Noted. <br /> <br />8. Add trails within RR ROW. <br />Response: 8’ bituminous trail added adjacent to railroad. Detail added. <br /> <br />9. Road width for 8th Avenue extension to be widened based on Kimley Horn draft plan. <br />Response: Please provide referenced Kimley Horn plans. <br /> <br />10. Parking additions may be required on PW property, plans to adjust accordingly. <br />Response: Please provide further information on parking required. <br /> <br />11. Magellan facility needs to be shown with existing easement until it is known if this can be <br />moved. <br />Response: Easement/facility relocation is being worked through with Magellan. City has <br />and will continue to be copied on all correspondence. When a resolution is settled on, <br />revised plans reflecting necessary changes will be submitted to the City.
The URL can be used to link to this page
Your browser does not support the video tag.