Laserfiche WebLink
Murlowski Industrial Park Preliminary & Final Plat <br />Planning Commission Report; 12-17-19 <br /> <br /> <br />Page 6 <br />Storm water / <br />Grading / <br />Erosion: <br /> No changes to storm sewer infrastructure are required as part of this plat. <br /> <br />Development <br />Phasing: <br /> Further development of the land and/or changes to uses would occur in the future, and <br />would be subject to further review and approval through a separate permitting process. <br /> <br />Utilities:  No changes to on-site utilities are proposed. <br /> If/when changes occur, all new utilities (i.e. telephone, electric, gas service lines, etc) <br />are to be placed underground in accordance with the provisions of applicable City <br />ordinances. <br /> <br />Lighting:  No changes to lighting are required or proposed as part of this plat. <br /> <br />Parking:  No changes to parking are proposed (or required) as a result of this plat. <br /> <br />Required <br />Signage: <br /> No changes to signage are proposed (or required) as a result of this plat. <br /> <br />Fire Hydrants / <br />Fire Safety: <br /> No changes to fire protection are required as a result of this plat. <br /> <br />Streetlights:  No changes to street lighting are required by this plat. <br /> <br />Sidewalks:  No changes to sidewalks are required by this plat. <br /> <br />Landscaping / <br />Fencing: <br /> No changes to landscaping are required by this plat. <br /> <br />Garbage <br />Enclosures: <br /> No changes to garbage enclosures are required by this plat. <br /> <br />Monuments:  Reference monuments shall be placed in the subdivision as required by state law.