Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />interoffice <br />MEMORANDUM <br /> <br /> <br /> <br />to: Ben Gozola, Assistant Director of Community Assets and Development/City Planner <br />from: Craig Schlichting, Director of Community Assets and Development <br />subject: Stinson Electric <br />date: November 13, 2020 <br /> <br />The Engineering Department has reviewed site renderings and we offer the following comments: <br /> <br /> Spot elevations must be provided to show that proposed changes to the site will result in proper <br />drainage. Elevation shots must include shots of the existing apron and the corrugated <br />pipe. Surfacing changes and any fencing proposed should also be added to the site plan. <br /> The applicants must work with the City on a proper replacement material for the existing HDPE <br />(high-density polyethylene) pipe to improve drainage and insure long term viability from the site’s <br />lowest spot. <br /> The applicants will need to work with the City to resolve area drainage issues when the larger City <br />storm sewer project is undertaken in the area (~2024) <br /> If the applicants are adding material (asphalt) to the site, the proposed spot elevations will need to <br />be included to insure local drainage is at least as good as it was prior to the work being done. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />