Laserfiche WebLink
REQUEST FOR CITY COUNCIL CONSIDERATION  <br />ITEM DESCRIPTION: CONSIDERATION OF RIGHT OF ENTRY AGREEMENTS FOR CITY PROJECT  <br />19‐6, SEWER CAPACITY IMPROVEMENTS  <br />DEPARTMENT HEAD’S APPROVAL:  Craig Schlichting – Director of Community Assets and  <br />Development  <br />CITY MANAGER APPROVAL:  <br />No comments to supplement this report _______              Comments attached ______  <br />Recommendation:    Upon City Attorney approval, authorize  the  City  Manager  and  Mayor  to  <br />enter  into  Right  of  Entry  Agreements for City Project 19‐6, Sewer Capacity Improvements.  <br />Legislative History:  <br />November 26, 2019  City Council authorized the Director of Community Assets and Development  <br />to enter into a contract with Bolton & Menk, Inc. for professional  <br />engineering  services and  authorized  the preparation of  plans and  <br />specification for City Project 19‐6, Sewer Capacity Improvements.    <br />Explanation: In January 2019, a capacity analysis of the existing sanitary sewer system was  <br />completed for areas of potential future redevelopment along Old Highway 8 NW and the current  <br />Midtown Village site. This analysis modeled potential future uses and identified specific segments  <br />of existing sanitary sewer main that will no longer be adequately sized during peak flows. As a  <br />result, City Project 19‐6, Sewer Capacity Improvements was initiated and will include upsizing and  <br />rehabilitating existing sewer mains to support future redevelopment.  <br />The sewer mains requiring upsizing and rehabilitation are located along rear lot lines within  <br />previously platted narrow alley and sewer easements. This condition presents a set of unique  <br />challenges and a complexity related to constructability and space constraints. Due to this, staff  <br />solicited a proposal for the design and implementation of the project. Bolton & Menk, Inc. was  <br />selected due to their expertise and working knowledge in trenchless technology (pipe bursting,  <br />horizontal directional drilling, cured‐in‐place‐pipe) which will be used to reduce the impacts to  <br />residents within the project corridor.   <br />The purpose of this item is to obtain Council authorization to enter into Right of Entry Agreements  <br />with the following properties:  <br />AGENDA SECTION:  Consent   <br />REPORT DATE:     May 6, 2020  <br />MEETING DATE:  May 12, 2020