Laserfiche WebLink
  <br />REQUEST FOR CITY COUNCIL CONSIDERATION  <br />ITEM DESCRIPTION: RESOLUTION TO CONSIDER BIDS AND AWARD OF CONTRACT FOR CITY  <br />PROJECT 20‐7 GROUND STORAGE RESERVOIR RECONDITIONING  <br />DEPARTMENT HEAD’S APPROVAL: Craig Schlichting, Director of Community Assets and  <br />Development  <br />CITY MANAGER APPROVAL:  <br />No comments to supplement this report _______              Comments attached ______  <br />  <br />Recommendation:  Accept all bids and adopt the attached Resolution awarding a contract for City  <br />Project 20‐7, Ground Storage Reservoir Reconditioning to the lowest responsible bidder, Viking painting  <br />LLC in the amount of $532,240.00  <br />  <br />Legislative History:   <br />  <br />April 30, 2020: The City Manager authorized entering into an agreement with KLM Engineering Inc. to  <br />complete  the  inspection,  plans,  specifications,  and  bidding  documents  in  2020  for  the  2021  <br />reconditioning project.  <br />  <br />September  22,  2020:  The  City  Council  Approved  the  Plans  and  Specifications  and  Authorized  the  <br />Advertisement for Bids for City Project 20‐7, Ground Storage Reservoir Reconditioning.  <br />  <br />October 27, 2020: Bids for the Ground Storage Reservoir Reconditioning were opened by staff.   <br />  <br />Financial Impact:  The following five bids were received and opened by staff at 1:00 pm on October 27,  <br />2020:  <br />  <br />1. Viking Painting, LLC.        $532,240.00  <br />2. Classic Protective Coatings, Inc.    $677,950.00  <br />3. Elevation Coating, LLC.      $765,000.00  <br />4. TMI Coatings, Inc.        $823,000.00  <br />5. The Osseo Construction Co, LLC.    $1,196,000.00  <br />  <br />A bid tabulation has been completed by KLM Engineering and all bid totals were verified. The low bid of  <br />$532,240.00 is eighteen percent below the engineer’s lowest estimate of $650,000.00.   <br />AGENDA SECTION: Consent  <br />REPORT DATE:  November 5, 2020  <br />MEETING DATE:  November 10, 2020