New Brighton 2021 Fee Schedule BUILDING PERMITS: Description 2020 2021ELECTRICAL FEES (Continued)RESIDENTIAL (Continued)Outside electrical reinstalled after siding replacement, house $50 (for the first/only unit) $50 (for the first/only unit) duplex, triplex, fourplex attached townhouses and apartments $25 (for each unit thereafter) $25 (for each unit thereafter)Electronic inspection fee for these items only: furnace, air conditioning, bath fan, fireplace, or receptacle for water heater vent. Must email required pictures.$40 $40Solar fees for PV system (both Residential and Commercial)0 - 5,000 watts $90 $90>5,000 watts to 10,000 watts$150 $150>10,000 watts to 20,000 watts $225 $225>20,000 watts to 30,000 watts $300 $300>30,000 watts to 40,000 watts$375 $375Additional increments of 10,000 watts $25 (for each additional $10K increment $25 (for each additional $10K incrementState Surcharge $1 $1 COMMERCIAL DescriptionFee CalculationFee CalculationValuation $1 to $1,000$50 per trip $50 per tripValuation >$1,000 to $2,000$50 for the first $1,000, plus $3.25 for each additional $100 or fraction thereof up to and including $2,000$50 for the first $1,000, plus $3.25 for each additional $100 or fraction thereof up to and including $2,000Valuation >$2,000 to $25,000$82 for the first $2,000, plus $14.85 for each additional $1,000 or fraction thereof up to and including $25,000$82 for the first $2,000, plus $14.85 for each additional $1,000 or fraction thereof up to and including $25,000Valuation >$25,000 to $50,000$423.55 for the first $25,000, plus $10.70 for each additional $1,000 or fraction thereof up to and including $50,000$423.55 for the first $25,000, plus $10.70 for each additional $1,000 or fraction thereof up to and including $50,000Valuation >$50,000 to $100,000$691.05 for the first $50,000, plus $7.45 for each additional $1,000 or fraction thereof up to and including $100,000$691.05 for the first $50,000, plus $7.45 for each additional $1,000 or fraction thereof up to and including $100,000
|