Laserfiche WebLink
B. <br />Total Cost by <br />Bid Breakdown of Lions Park <br />Item <br />New Brighton Cost <br />Ramsey County Cost <br />General Project Supervision <br />$75.040.00 <br />$57,684.38 <br />$17,355.62 <br />Site Removals and Demolition <br />$6,200.00 <br />$3,267.57 <br />$2,932,43 <br />Erosion Control <br />$9,300.00 <br />$6,781.25 <br />$2,518.75 <br />Mass Grading <br />$72,000.00 <br />$43,578.95 <br />$28,421,05 <br />Future Building Soil Corrections <br />$48.000.00 <br />$6.000.00 <br />$42,000,00 <br />Porous Paver Excavation. Drainage Aggregate <br />$62.000.00 <br />$31.000.00 <br />$31.000.00 <br />Prescribed Topsoil <br />$217.000.00 <br />$217.000.00 <br />Aglime <br />$11,000.00 <br />$11,000.00 <br />Ball Field and Totlot Draintile <br />$74,000.00 <br />$74,000.00 <br />Totlot Wood Fiber <br />$21,000.00 <br />$21,000.00 <br />Storm Sewer <br />$10,000.00 <br />$9,285.71 <br />$714.29 <br />Sanitary Sewer <br />$25,000.00 <br />$12,500,00 <br />$12,500.00 <br />Watermain <br />$37,500.00 <br />118,750.00 <br />$18,750.00 <br />Parking Lot Curb <br />$45,000.00 <br />$22,500.00 <br />$22,500.00 <br />Parking Lot Paving <br />$170,000.00 <br />$85,000.00 <br />$85,000.00 <br />Porous Pavers <br />$103,500.00 <br />$51,750.00 <br />$51,750.00 <br />Parking Lot Lighting <br />$136.000.00 <br />$68.000.00 <br />$68,000.00 <br />Concrete Sidewalks <br />$50.000.00 <br />$25,000.00 <br />$25,000.00 <br />Paved Trails <br />$51,000.00 <br />$44.755.10 <br />$6.244.90 <br />Concrete Maintenance Strip <br />$71.000.00 <br />$71,000.00 <br />Concrete totlot curb <br />$7,000.00 <br />$7,000.00 <br />Athletic Equipment <br />$59,000.00 <br />$59,000.00 <br />Ball Field Lighting <br />$375,000.00 <br />$375,000.00 <br />Irrigation System <br />$60,000.00 <br />$56,250.00 <br />$3,750.00 <br />Seeding, Sodding <br />$43,000.00 <br />$37,098.04 <br />$5,901.96 <br />Trees, Shrubs <br />$30,000.00 <br />$22,173.91 <br />$7,826.09 <br />Totals <br />$1,868,540.00 <br />$1,436,374.91 <br />$432,165.09 <br />C. Costs associated with the Long Lake Regional Park improvements that are unrelated to the <br />shared parking lot, sidewalk and trail improvements will be the responsibility of the County <br />D. The parties shall share in the costs incurred by the City for professional services associated <br />with the project, including, but not limited to, engineering, site design, environmental <br />reporting, geotechnical recommendations, and soil borings. The City will fund these costs <br />when the services are provided. The professional services fees that have been accumulated <br />by the City as of the effective date of this Agreement to prepare final plans and solicit bids <br />resulted in the City's share at $53,599.29 and the County's share at $12,910.71. Fees <br />incurred by the City following the effective date of this Agreement will be allocated to the <br />parties by New Brighton's Director of Community Assets and Development and the Ramsey <br />County Parks and Recreation Director. The County intends to apply for Metropolitan <br />Regional Park System bond funds in order to pay for its share of the fees when these funds <br />become available. When awarded the bond funds, the County will reimburse the City for <br />the County's share of the fees. Should the County not acquire funding from bond funds by <br />the December 31, 2020, the County will reimburse the City for the County's share of the <br />-3 <br />488663v2 S.IS NEI 36-24 <br />