B.
<br />Total Cost by
<br />Bid Breakdown of Lions Park
<br />Item
<br />New Brighton Cost
<br />Ramsey County Cost
<br />General Project Supervision
<br />$75.040.00
<br />$57,684.38
<br />$17,355.62
<br />Site Removals and Demolition
<br />$6,200.00
<br />$3,267.57
<br />$2,932,43
<br />Erosion Control
<br />$9,300.00
<br />$6,781.25
<br />$2,518.75
<br />Mass Grading
<br />$72,000.00
<br />$43,578.95
<br />$28,421,05
<br />Future Building Soil Corrections
<br />$48.000.00
<br />$6.000.00
<br />$42,000,00
<br />Porous Paver Excavation. Drainage Aggregate
<br />$62.000.00
<br />$31.000.00
<br />$31.000.00
<br />Prescribed Topsoil
<br />$217.000.00
<br />$217.000.00
<br />Aglime
<br />$11,000.00
<br />$11,000.00
<br />Ball Field and Totlot Draintile
<br />$74,000.00
<br />$74,000.00
<br />Totlot Wood Fiber
<br />$21,000.00
<br />$21,000.00
<br />Storm Sewer
<br />$10,000.00
<br />$9,285.71
<br />$714.29
<br />Sanitary Sewer
<br />$25,000.00
<br />$12,500,00
<br />$12,500.00
<br />Watermain
<br />$37,500.00
<br />118,750.00
<br />$18,750.00
<br />Parking Lot Curb
<br />$45,000.00
<br />$22,500.00
<br />$22,500.00
<br />Parking Lot Paving
<br />$170,000.00
<br />$85,000.00
<br />$85,000.00
<br />Porous Pavers
<br />$103,500.00
<br />$51,750.00
<br />$51,750.00
<br />Parking Lot Lighting
<br />$136.000.00
<br />$68.000.00
<br />$68,000.00
<br />Concrete Sidewalks
<br />$50.000.00
<br />$25,000.00
<br />$25,000.00
<br />Paved Trails
<br />$51,000.00
<br />$44.755.10
<br />$6.244.90
<br />Concrete Maintenance Strip
<br />$71.000.00
<br />$71,000.00
<br />Concrete totlot curb
<br />$7,000.00
<br />$7,000.00
<br />Athletic Equipment
<br />$59,000.00
<br />$59,000.00
<br />Ball Field Lighting
<br />$375,000.00
<br />$375,000.00
<br />Irrigation System
<br />$60,000.00
<br />$56,250.00
<br />$3,750.00
<br />Seeding, Sodding
<br />$43,000.00
<br />$37,098.04
<br />$5,901.96
<br />Trees, Shrubs
<br />$30,000.00
<br />$22,173.91
<br />$7,826.09
<br />Totals
<br />$1,868,540.00
<br />$1,436,374.91
<br />$432,165.09
<br />C. Costs associated with the Long Lake Regional Park improvements that are unrelated to the
<br />shared parking lot, sidewalk and trail improvements will be the responsibility of the County
<br />D. The parties shall share in the costs incurred by the City for professional services associated
<br />with the project, including, but not limited to, engineering, site design, environmental
<br />reporting, geotechnical recommendations, and soil borings. The City will fund these costs
<br />when the services are provided. The professional services fees that have been accumulated
<br />by the City as of the effective date of this Agreement to prepare final plans and solicit bids
<br />resulted in the City's share at $53,599.29 and the County's share at $12,910.71. Fees
<br />incurred by the City following the effective date of this Agreement will be allocated to the
<br />parties by New Brighton's Director of Community Assets and Development and the Ramsey
<br />County Parks and Recreation Director. The County intends to apply for Metropolitan
<br />Regional Park System bond funds in order to pay for its share of the fees when these funds
<br />become available. When awarded the bond funds, the County will reimburse the City for
<br />the County's share of the fees. Should the County not acquire funding from bond funds by
<br />the December 31, 2020, the County will reimburse the City for the County's share of the
<br />-3