My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.01.07 PREC Packet
NewBrighton
>
Commissions
>
Parks and Recreation
>
Parks and Rec Packets
>
2015
>
2015.01.07 PREC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 10:47:25 AM
Creation date
3/24/2021 2:29:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to Myo <br />NBRUM <br />NE�V <br />the city that works for Ftur <br />NEW BRIGHTON PARKS, RECREATION, AND ENVIRONMENTAL COMMISSION <br />MINUTES <br />October 1, 2014 APPROVED <br />Call to Order <br />The meeting was called to order at 6:33 p.m. by Chair Frischman <br />Roll Call <br />Members Present: Commissioners Brunell, Cook, Eischen, Frischman, Jones, Kunesh- <br />Podein, Parker and Council Liaison Strub <br />Members Absent: Commissioners Fields and Lundberg <br />Also Present: Sandy Breuer, Director of Parks and Recreation; Chris Wolla, Parks <br />Superintendent, Grant Wyffels, Director of Public Works and Craig Schlichting, Senior <br />Engineering Supervisor <br />III. Minutes of September 3, 2014 <br />MOTION BY COMMISSIONER EISCHEN, SECONDED BY COMMISSIONER <br />KUNESH-PODEIN, TO APPROVED THE SEPTEMBER 3, 2014 MINUTES AS <br />SUBMITTED. MOTION CARRIED. <br />IV. Correspondence <br />None <br />V. Old Business <br />None <br />VI. New Business <br />None <br />VII. Trails, Bike and Walk -ways —Grant Wyffels & Craig Schlichting <br />a. Update on County/City Projects <br />a. City Project - 2015-1 Street Rehabilitation <br />i. County Road F Bridge- construction to start June, 2015. Bridge will <br />totally be taken down. <br />ii. Innsbruck Park Improvements — increase size and dredge to get <br />sediment out. <br />iii. 10th Street & 8th Street including a multi -use trail on the south side of <br />10th Street from (8 foot trail would run to 1St Ave.) Next year County <br />Rd F Bridge will be replaced and the trail will continue past the bridge <br />to Mounds View H.S. A new traffic signal at 10th St. and Old Hwy 8 <br />and lane modifications in the New Brighton Exchange area. Right turn <br />lane added on Old 8. New lighting also proposed (more decorative <br />and LED which lasts a long time). The crosswalk by the New Brighton <br />Community Center will also be upgraded. <br />b. MnDOT/Ramsey County Updates (Highway 96) — 2015. Bridge will be taken <br />down in segments so it will be open to one lane most of the time. The bridge <br />at County Road H is slated for 2016. Part of that will enter into the TCAAP <br />site. South of County Road F bridge is 2015. County Road E2 bridge is 2016. <br />All of these have pedestrian improvements with the bridge replacement. The <br />H bridge is a signature bridge as considered by Arden Hills. It is the north <br />entrance into TCAAP. There will be pedestrian crossings. Highway 96 is a <br />divergent diamond interchange. The trails will be on the inside of the bridge. <br />October 1, 2014 Parks, Recreation and Environmental Commission Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.