My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.03.04 PREC Packet
NewBrighton
>
Commissions
>
Parks and Recreation
>
Parks and Rec Packets
>
2015
>
2015.03.04 PREC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 10:42:31 AM
Creation date
3/24/2021 2:35:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Benefits <br />• Annual Total Phosphorus removal: 148-194 lbs <br />• 16.4 acre-feet removed from Long Lake flood peak window <br />• Decreased peak water elev. at 10th St NW (Polynesian Village) <br />— 1.11 feet for 10 -year event (from 873.82 to 872.71) <br />— 0.15 feet for 100 -year event (from 877.74 to 877.59) <br />• Improve access &reduce cost of future pond maintenance <br />• Substantial opportunity for education in heavily used City park <br />• Reduced frequency and/or duration of trail flooding <br />• Flood protection for adjacent homes on NW side of park <br />• Create new boardwalk/trail access across island <br />• Opportunity for City to improve or modify ballfields and trails <br />
The URL can be used to link to this page
Your browser does not support the video tag.