My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.03.04 PREC Packet
NewBrighton
>
Commissions
>
Parks and Recreation
>
Parks and Rec Packets
>
2015
>
2015.03.04 PREC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 10:42:31 AM
Creation date
3/24/2021 2:35:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />Rice Creek Watershed District <br />Date: February 23, 2015 <br />To: City of New Brighton <br />Sandy Breuer, Director of Parks and Recreation <br />Parks, Recreation & Environmental Commission <br />From: Kyle Axtell, RCWD Water Resource Specialist <br />Subject: Hansen Park Water Quality & Flood Control Project — Concept Plan <br />INTRODUCTION <br />RCWD, the City of New Brighton, and other partners, using funding from the MN Board of Water and <br />Soil Resources' (BWSR) Clean Water Fund, have been diligently working to develop a series of projects <br />aimed at improving water quality in and around Long Lake and reducing regional flooding throughout <br />the Ramsey County Ditches 2, 3 & S (RCD 2/3/S) drainage area in the southwestern portion of the Rice <br />Creek Watershed. One of our key projects is being developed for Hansen Park in the center of the City <br />of New Brighton. The purpose of this agenda item is to introduce this project and its history to the <br />Parks, Recreation & Environmental Commission, explain the concept plans and review the upcoming <br />timelines. RCWD staff will provide a presentation covering the materials provided below. This will be a <br />great time for the Commission to ask questions about the project and provide input to RCWD and City <br />staff. <br />BACKGROUND & DISCUSSION <br />As you may be aware, there are several areas of known flooding problems within the City of New <br />Brighton, particularly around Long Lake. This situation was exacerbated by the extreme rainfall and <br />flooding experienced in July 2011. Following those events, the Cities of New Brighton and Saint Anthony <br />jointly developed an investigation report in 2012 identifying flood -prone areas and a preliminary list of <br />projects that could be pursued to address the lack of flood storage and flood conveyance issues within <br />the cities. This ultimately led to the two Cities formally petitioning the RCWD in 2013 to undertake a <br />Basic Water Management Project in the RCD 2/3/S area identifying flood control and conveyance <br />improvement projects and working with the Cities to build them. The City of Roseville also later joined <br />the petition. <br />Long Lake and Pike Lake are both on Minnesota's impaired waters list. The impairment is for excess <br />nutrients (phosphorus) that cause algae blooms and decreased water clarity, which impact recreational <br />opportunities and alter the ecology of the lakes. As the RCWD began working on the Basic Water <br />Management Project, it also pursued identification of project that would offer water quality <br />improvements as well as flood control. The idea of a project at Hansen Park continually rose to the top <br />of the list. And, through the petition process, the Cities have requested that the RCWD expedite <br />development of the Hansen Park project in advance of the remaining phases of the Basic Water <br />Management Project. <br />Since that time, RCWD has been working diligently with its consulting engineer, Houston Engineering, <br />Inc. (HEI) and City Staff to finalize a concept plan for a proposed set of projects within Hansen Park. We <br />feel the concept is developed enough to present to the Commission (see attached plan sheet). Primary <br />components include a complete dredging and reshaping of Hansen Pond (adds water quality treatment <br />and removes contaminated sediments from within the pond), construction of a new dam and outlet <br />control structure (allows for water level management, adds flood storage capacity), and installation of <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.