Laserfiche WebLink
4 <br />ELEVATION (Looking North) <br />10' +/- <br />(Mid -Height <br />Abutment) <br />6'+f- IG I Y. KU. r- <br />SECTION (At Piers) <br />SOUTHBOUND <br />NORTHBOUND <br />DESIGN NOTES <br />ORandom ashlar stone rustication on wingwall and abutment faces with 3 to 5 color application <br />to replicate limestone <br />OWingwallfabutment corner pier with design and color (light tan) to match existing 1-35W 1 <br />Hwy 10 bridges <br />OConcrete beam with color (light tan) to match existing 1-35W I Hwy 10 bridges <br />® LED street light with style and color (green) to match existing New Brighton street lights <br />® Two foot square pier with random ashlar stone rustication and 3 to 5 color application to <br />replicate limestone, and match wingwall and abutment faces <br />© Concrete parapet with simple inset panel and color (light tan) to match existing 1-35W/ <br />Hwy 10 bridges <br />OOrnamental metal railing with style and color (green) similar to the existing New Brighton <br />fence at Cty Rd F <br />® Concrete parapet and structural tube railing with color (light tan) of concrete to match existing <br />1-35W / Hwy 10 bridges, and color (green) to match proposed ornamental metal railing and <br />street lights <br />OConcrete pier and cap configuration, style and color (light tan) to match existing 1-35W/ Hwy <br />10 bridges <br />'Iat d + <br />'BId GFIl'ON AXD <br />HML�S MaUNDS VHEW � <br />Nµ^— <br />uv WUMV <br />�Kimley*Horn <br />DESIGN INSPIRATION <br />1-35W CORRIDOR BRIDGE CONCEPT <br />COUNTY ROAD E2 NORTH TO COUNTY ROAD H <br />JUNE 2014 <br />