My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.11.04 PREC Packet
NewBrighton
>
Commissions
>
Parks and Recreation
>
Parks and Rec Packets
>
2015
>
2015.11.04 PREC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 10:28:59 AM
Creation date
3/26/2021 4:10:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cut / Excavation (CY) <br />Common Excavation (CY) <br />68165 Excavation CUT volume (unadjusted) - per CAD Common Excavation volume surface (includes topsoil) <br />4480 removal of existing dam embankment materials to be replaced with clay core (east side of dam) <br />1070 overexcavation to place IESF materials <br />-1230 less bituminous trail holddown <br />-57154 less Dredge Material Excavation <br />15331 Subtotal - Cuts - Compacted Volume (Borrow Material Available for Construction not including Dredge Mgmt Level 1 Materials) <br />Dredge Materials (CY) <br />Compacted Loose (assuming 1.7 fill factor) <br />33017 46224 Dredge Mgmt Level 1 total available material for onsite use <br />12367 21024 Dredge Mgmt Level 2 to be relocated offsite <br />11770 20009 Dredge Mgmt Level 3 to be relocated offsite <br />57154 Subtotal - Cuts (Dredge Materials) - Compacted Volume per CAD Volume Surface <br />87257 Subtotal - Cuts (Dredge Materials) - Loose Volume <br />Fills (CY) from onsite sources - Required <br />Compacted Loose (assuming 1.4 fill factor) <br />24694 34572 Excavation FILL volume - per CAD Common Excavation volume surface (includes topsoil) <br />34572 Subtotal - Fills - Loose Volume Required <br />-15331 less available onsite borrow material <br />-19240 less available Dredge Mgmt Level 1 material consumed onsite <br />0 Soil Balance <br />26984 Dredge Mgmt Level 1 material to be relocated offsite <br />I hereby certify that this plan, specification, or report was prepared by me or under <br />my direct supervision and that I am a duly Licensed Professional Engineer under <br />the laws of the State of Minnesota. <br />Signature: Date: xx-xx-2015 <br />Houston <br />Engineering Inc. <br />Maple Grove <br />Drawn by <br />DJL <br />Date <br />9-30-15 <br />HANSEN PARK PROJECT <br />PRELIMINARY DESIGN PHASE <br />NEW BRIGHTON, MINNESOTA <br />RICE CREEK WATERSHED DISTRICT <br />VOLUMES <br />PROJECT NO. R145555-240 <br />SHEET <br />13 <br />P: <br />F: <br />763.493.4522 <br />I 763.493 .... <br />Checked by <br />DDM <br />scale <br />AS SHOWN <br />No. Revision Date By <br />Printed Name: Dennis McAlpine License #: 46827 <br />
The URL can be used to link to this page
Your browser does not support the video tag.