Laserfiche WebLink
Page 3 of 4 <br /> <br />BE IT FURTHER RESOLVED, that approval of the special use permit amendment shall be <br />subject to the following conditions: <br />1. All employee crews and 3rd party landscape contractor crews (wholesale customers) shall <br />use the 1st St SW to 8th Ave SW entrance / exit route to separate business traffic from retail <br />traffic. Retail customers with trailers shall be instructed to exit via 8th Ave SW. Direct <br />ingress & egress via the driveway on to Old Highway 8 shall be used by customers only. <br />2. The applicant shall work with staff on ingress/egress requirements for staff and customers as <br />part of and following any reconstruction/reconfiguration of the Old Highway 8 corridor <br />3. Lighting on the site and building shall be directed downward and be installed so as to prevent <br />direct light from being detectable at all lot lines. Lighting is also not to shine directly into the <br />public right-of-way. Any problems with existing lighting that are later identified shall be <br />brought into compliance with code requirements. <br />4. The applicants shall provide a narrative of spill control practices for equipment stored near <br />creek, and come to an agreement with DCAD staff on final mitigation measures to contain <br />and prevent materials from leaving the site and entering the creek/ditch as may be needed <br />both now and in the future. <br />5. The applicant shall obtain all needed permits from the Rice Creek Watershed District <br />(RCWD), and agree to address storm water concerns if unforeseen issues arise (or become <br />foreseeable) as a result of the on-site storage. <br />6. The applicants shall provide spot elevations and a grading/drainage plan for proposed <br />employee parking lot for staff approval prior to the improvement being made. Drainage <br />created by the proposed parking lot shall not adversely affect neighboring properties. <br />7. The applicants shall stripe the new employee parking lot and customer spaces per the <br />approved plan upon completion of paving. <br />8. The applicants shall provide an updated survey to staff showing on-site utilities, and <br />accommodate minor site changes if directed to do so by the City to protect these utility lines. <br />9. The applicants will provide the fire marshal with updated Material Safety Data (MDS) sheets <br />as may be needed. <br />10. The applicants shall either make improvements to the site to eliminate tracking of dirt into <br />the street, or shall pay for street sweeping services whenever directed to do so by the City. <br />11. Sign changes on the building and/or site will need to be reviewed and approved via a separate <br />sign permitting process.